Installation check-out  

 

When  installation  has  been  completed,  the  unit  is  ready  to  be  placed  into  service.  Proceed  as  follows,  while 
checking the unit for any leakages: 
 
1.

 

Place unit in bypass and turn on main water supply; open a cold water tap nearby and allow water to run for a 
few minutes until all foreign material that may have resulted from the installation is washed out; close the tap. 

2.

 

Slowly shift the bypass valve to the service position and secure it; allow water to completely fill the resin tank. 

3.

 

Carefully open a cold water tap and allow water to run for at least 2 minutes to set the resin bed and purge air 
from the unit; close the tap. 

4.

 

Program the control valve according to the specific installation (refer to “Programming” on pg. 11). 

5.

 

Press the 

scroll 

 button repeatedly until the display shows: 

  

 
 

6.

 

Leave the control valve in this position; the countdown timer will countdown to 0 sec and start a regeneration. 

7.

 

The motor will start and the display will show: 

 

 
 
8.

 

You can press the 

scroll 

 button again to switch the motor to full speed, which will shorten the transfer time 

needed by the control valve to reach the next position. 

9.

 

The motor will move the control valve into backwash position; allow water to run to drain until all of the air is 
purged from the system. 

10.

 

Fill the brine tank with water, higher then the air-check level. 

11.

 

Press the 

scroll 

 button; the motor will start and the display will show:  

 

 
 
12.

 

The motor will move the control valve into brine/slow rinse position; allow it to draw water from the brine tank 
until the aircheck closes. 

13.

 

Press the 

scroll 

 button; the motor will start and the display will show:  

 

 
 
14.

 

The motor will move the control valve into fast rinse/brine refill position; allow water to run to drain and brine 
tank for the entire cycle time, to fill the brine tank to the programmed level. 

15.

 

Add salt to the brine tank. 

 
 

Mixing valve 

 

To adjust the residual hardness, the incorporated mixing valve must be regulated in function of the hardness of the 
incoming water and the desired residual hardness 

 

To increase the residual hardness: turn screw counter clockwise. 

 

To decrease the residual hardness: turn screw clockwise. 

Regen in 10 sec 

Rgn:XXX Cyc1: YY 

 

Rgn:XXX Cyc2:YYY 

 

Rgn:XXX Cyc3: YY 

 

Содержание 2400VS Series

Страница 1: ...A Division of Aquion Inc 2400VS SERIES Technical Manual...

Страница 2: ...age 10 Diagnostics level Page 13 Parts Replacement Printed Circuit Board Page 14 Drive motor Page 15 Injector Page 15 Backwash flow control Page 16 Brine refill flow control Page 16 Brine tee Page 16...

Страница 3: ...A Division of Aquion Inc Art Nr Tech_Man ENG 2400VS 2013 06...

Страница 4: ......

Страница 5: ...resin The throughput is dependent on the maximum permissible pressure drop for the complete water softener and the maximum permissible specific load of the resin generally taken as 40 litres soft wate...

Страница 6: ...g pressure Operating temperature Electrical rating 1 4 8 3 bar 20 120 psi 2 48 C 35 120 F 24V 50 Hz max 500 mA Regeneration Controller software regeneration initiation regeneration mode time of regene...

Страница 7: ...2400VS SERIES Erie Water Treatment Controls Belgium Page 3 Flow Diagrams SERVICE BACKWASH BRINE SLOW RINSE FAST RINSE BRINE REFILL...

Страница 8: ...1 2 23 2 27 1 70 3 94 3 45 0 68 1 06 2 01 1 63 2 42 2 46 1 97 4 28 4 14 0 68 1 17 2 04 1 78 2 61 2 65 2 20 4 58 The following table is only an indication and is valid for an inlet pressure of 3 bar an...

Страница 9: ...set by increments of 1 min The following tables are only an indication and are valid for a brine valve with a refill rate that equals or exceeds the rate of the refill flow control Brine refill F C Pr...

Страница 10: ...al connections must be done in accordance with local codes Do not install the unit too close to a water heater min 3 m of piping between outlet of unit and inlet of heater water heaters can sometimes...

Страница 11: ...press the scroll button again to switch the motor to full speed which will shorten the transfer time needed by the control valve to reach the next position 9 The motor will move the control valve into...

Страница 12: ...n the correct time of day during a period of several hours consequently in case of prolonged power failure the time of day might not be maintained if this happens the time of day indication will flash...

Страница 13: ...total remaining regeneration time the actual regeneration cycle and the remaining cycle time total remaining actual regen remaining regen time cycle cycle time The control valve can be reset to servic...

Страница 14: ...er access code i e key sequence needs to be entered In the programming modes a flashing indication implicates that this parameter can be adjusted by pressing the up button or down button in this techn...

Страница 15: ...Press the scroll button again the display will show Press the up button or down button to set the volume of resin 5 Press the scroll button again the display will show Press the up button or down butt...

Страница 16: ...ration is started 9 Press the scroll button again the display will show only when the regeneration mode was set to Delayed or Dlyd Immd Press the up button or down button to set the time of regenerati...

Страница 17: ...tions that have taken place since installation TotVol display shows the total water usage through the unit since installation LastRgn display shows the water usage at the moment of the last regenerati...

Страница 18: ...THE WATER PRESSURE Printed Circuit Board 1 Loosen the 3 front cover screws and remove the front cover 2 Disconnect all connectors from the PCB 3 Remove the flat cable of the 3 button control pad from...

Страница 19: ...cover together 3 Lift the valve cover away from the valve body 4 Remove the rotor assembly from the valve cover the white Teflon O ring will remain in the valve cover 5 Remove the seal plate from the...

Страница 20: ...f necessary 6 Install the rotor assembly into the valve body ensuring that the arrow on the worm gear is pointing directly towards the second tooth on the worm drive shaft facing the front of the cont...

Страница 21: ...ing inside of the float valves shaft 6 Install the float valve straight up into the float chamber of the valve body 7 Reverse the procedure for reassembly refer to Parts Replacement Gasket Timer head...

Страница 22: ...nting down mark on the drive shaft pointing up 1 if this is not the case refer to Parts Replacement Drive motor Step 2 Valve body 1 Remove the drain hose from the drain elbow 2 Remove the 6 bolts hold...

Страница 23: ...2400VS SERIES Erie Water Treatment Controls Belgium Page 19...

Страница 24: ...t 12 Leak at riser tube 12 Verify that riser tube is seated correctly and is not cracked Unit fails to regenerate Cause Solution 1 Faulty electrical supply 1 Verify electrical service fuse transfo 2 D...

Страница 25: ...refill flow control 3 Verify that flow control is free of debris Unit uses too much salt Cause Solution 1 Excessive water in brine tank 1 Refer to problem Excessive water in brine tank 2 Unit regener...

Страница 26: ...ributor 2 Verify that distributors are free of debris 3 Crushed lower and or upper distributor 3 Replace distributor s Drain flows continuously Cause Solution 1 Defective PCB 1 Replace PCB 2 Defective...

Страница 27: ...ecked annually 1 Clean out injector 2 Clean brine refill flow control 3 Clean backwash flow control 4 Verify correct functioning of flow meter clean impeller if necessary 5 Verify programming of timer...

Страница 28: ...2400VS SERIES Erie Water Treatment Controls Belgium Page 24 Exploded Views Part Numbers Electronic timer...

Страница 29: ...ief flow meter cable 7 15 222 Screw back plate 2x 8 71502 Screw timer cover 3x 9 70962 Back plate 10 2100 206 Drive shaft 11 15 222 Screw drive motor assy 2x 12 72261 Drive motor 13 568 227 2 Worm 14...

Страница 30: ...2400VS SERIES Erie Water Treatment Controls Belgium Page 26 Valve body...

Страница 31: ...7 L Sleeve mixing valve 25 568 385 2 Brine refill flow control 26 186 118 O ring refill elbow 27 568 336 Refill elbow 28 541 275 Check ball refill elbow 29 413 62 Spring refill elbow 30 21 88 Nut refi...

Страница 32: ...30 24VAC 12VA UK plug J no transfo I Injector 4 1 2 5 B Backwash flow control 0 no flow control Nr Gal min L min E 1 6 6 1 F 1 8 6 8 G 2 0 7 6 H 2 2 8 3 J 2 6 9 8 T 3 0 11 4 K 3 5 13 2 L 4 0 15 1 M 5...

Страница 33: ......

Отзывы: