Installation
Assembly
For proper assembly of control valve and resin tank, proceed as follows:
1.
Rinse the resin tank well before use.
2.
Attach the lower distributor to the riser tube using PVC-glue or a stainless steel pin.
3.
Lower the riser tube into the resin tank so that it touches the bottom.
4.
Cut the riser tube 13 mm (= 1/2”) below the top of the tank threads and chamfer the tube to prepare for
insertion into the control valve.
5.
Temporary plug the top of the riser tube to prevent resin from entering the tube and fill the tank with resin for
max. 3/4 full.
6.
Make sure the O-ring in the riser insert of the control valve is in the correct position; screw the upper
distributor onto the control valve.
7.
Lubricate the threads, the top of the riser tube and the tank O-ring of the control valve.
8.
Lower the control valve straight down onto the riser tube and screw it onto the tank.
Installation
!!! ATTENTION
For proper functioning of the unit, incoming water pressure should be between a minimum of 1,4 bar during
regeneration and a maximum of 8,3 bar in service; if necessary, a pressure reducer must be installed ahead of
the system.
Installation must only be undertaken by a person competent in plumbing.
All plumbing and electrical connections must be done in accordance with local codes.
Do not install the unit too close to a water heater (min. 3 m of piping between outlet of unit and inlet of heater);
water heaters can sometimes transmit heat back down the cold pipe into the control valve; always install a
check valve at the outlet of the system.
If the control valve is not equipped with a bypass, a three valve bypass system must be installed to enable
bypassing during servicing.
For proper installation of the unit, proceed as follows:
1.
Inlet/outlet
: connect the inlet and outlet to the control valve; when facing the front of the control valve, the
inlet is at the left and the outlet at the right side.
2.
Drain line
: connect a hose to the drain line fitting on the control valve and secure it; insert the drain hose into
a standpipe, with siphon if required; make sure the drain hose is:
as short as possible,
not elevated too much,
free of kinks,
as this will all create undesired counter-pressure.
3.
Brine line
: an aircheck is required for proper brining during regeneration, but a float-controlled brine valve
system can be used as a double security; 3/8” polytube must be used to connect the brine system to the control
valve; do not overtighten the nut.
4.
Transformer
: make sure the power source carries the same rating as the transformer; plug transformers output
lead (with plug ø 2,5 mm x 5,5 mm) into socket at the timers power lead and plug transformer into socket; the
connection can be secured by means of the wire clip.
Содержание 2400VS Series
Страница 1: ...A Division of Aquion Inc 2400VS SERIES Technical Manual...
Страница 3: ...A Division of Aquion Inc Art Nr Tech_Man ENG 2400VS 2013 06...
Страница 4: ......
Страница 23: ...2400VS SERIES Erie Water Treatment Controls Belgium Page 19...
Страница 28: ...2400VS SERIES Erie Water Treatment Controls Belgium Page 24 Exploded Views Part Numbers Electronic timer...
Страница 30: ...2400VS SERIES Erie Water Treatment Controls Belgium Page 26 Valve body...
Страница 33: ......