
Procedure
3
Procedure
This section describes the RBS 3107 installation procedure.
Overview of the RBS 3107
The figure below gives an overview of the RBS 3107.
P014424C
ACCU with power cable connection
Ground
connector
DF with cable
inlet for transmission,
alarm and GPS,
including OVP
LAN connector
Batteries
RF cable inlet
Temperature sensor
cable connector and
battey cable connector
Figure 1
RBS 3107 Overview
Workflow
The figure below shows the workflow for installing the RBS 3107.
5
1/1531-COH 109 2073 Uen H 2006-11-06
All manuals and user guides at all-guides.com