QUICK GUIDE
13
5.7 CHECK THE AIR DELIVERY SYSTEM SETUP
1.
Check that the air delivery system is completely air tight. Fix any air leaks before
advancing to the next step.
2.
Check that all seed metering units are set to 100% upper air lines.
3.
Check that the gear ratio of the metering units is set correctly to high or low range
depending on the product application rate.
4.
Check that the fan pressure is correctly set for the desired product application rate.
Ensure the fertilizer fan pressure is set 0.2 to 0.4 kPa above the seed fan
Содержание AIR CART
Страница 1: ...0 OPERATOR MANUAL AIR CART...
Страница 5: ...IDENTIFICATION 4 IDENTIFICATION Record the Air Cart s data on the name tag below...
Страница 21: ...FRAME 20...
Страница 28: ...AUGER 27 Bottom position Side position Spring bolt...
Страница 47: ...MAINTENANCE AND INSPECTION 46 9 3 LOCATION OF GREASE POINTS Front steering axle...
Страница 48: ...MAINTENANCE AND INSPECTION 47 Auger A Auger bearing B Inner swing arm hinge A B C D E...
Страница 49: ...MAINTENANCE AND INSPECTION 48 C Outer swing arm hinge D Auger rotation hinge E Auger tilt hinge...
Страница 53: ...TROUBLESHOOTING 52 SCHEMATICS...
Страница 54: ...TROUBLESHOOTING 53...