SC-F2000
Revision C
DISASSEMBLY & ASSEMBLY
Disassembly and Assembly Procedure
118
Confidential
1.
Disconnect the FFC from the connector (CN100) of the CR SUB BOARD.
2.
Hide the A part of the film (1) under the FFC.
Figure 3-72. Installing the film (1) (1)
3.
Insert the B part of the film (1) in under of the APG shaft.
Figure 3-73. Installing the film (1) (2)
4.
Insert the A part of the film (1) in the space between the FFC and the CR UNIT.
Figure 3-74. Installing the film (1) (3)
5.
Insert the C part of the film (1) in inside of spring.
Figure 3-75. Installing the film (1) (4)
CR SUB BOARD
CN100
FFC
A part
APG shaft
B part
FFC
A part
CR UNIT
Spring
C part
Spring
C part
Содержание SC-F2000 Series
Страница 1: ...SC F2000 Direct To Garment Printer SERVICE MANUAL SECP13002 Confidential ...
Страница 10: ...Confidential C H A P T E R 1 PRODUCTDESCRIPTION ...
Страница 29: ...Confidential C H A P T E R 2 TROUBLESHOOTING ...
Страница 52: ...Confidential C H A P T E R 3 DISASSEMBLY ASSEMBLY ...
Страница 192: ...Confidential C H A P T E R 4 ADJUSTMENT ...
Страница 285: ...Confidential C H A P T E R 5 MAINTENANCE ...
Страница 300: ...Confidential C H A P T E R 6 APPENDIX ...