
12
Call 1300 369 273
www.enware.com.au
STEP 6
Locate the spout and take the grub screw out
completely. Fit the spout onto the spout retainer.
Check that the grub screw hole lines up with
the groove on the brass spout retainer, then
lock the spout in place using the grub screw.
SEE IMAGES 14 & 15
STEP 7
Commission the valve as stepped out in
commissioning procedure on page 19.
NOTE: Do not high pressure test the supply
system, as this may damage the thermostatic
cartridge (Max 1000KPa).
STEP 8
Using the 3/8” Allen key, wind the temperature
adjustment gear anti clockwise until it comes to
a firm stop. This will close the thermostatic valve.
SEE IMAGE 16
IMAGE 14
IMAGE 16
INSTALLATION PROCEDURE
FRONT OF WALL
IMAGE 15