background image

hot enough to cause burns if touched by children. Non-combustible shielding or guards may be required.

3. Termination must exhaust above the inlet elevation. It is recommended that at least five feet of vertical pipe be 

installed outside when the appliance is vented directly through a wall, to create some natural draft to prevent the 

possibility of smoke or odor during appliance shut down or power failure. This will keep exhaust from causing a 

nuisance or hazard from exposing people or shrubs to high temperatures. In any case, the safest and preferred 

venting method is to extend the vent through the roof vertically.

4. Distance from the bottom of the termination and grade is 12” (30 cm) minimum. This is conditional upon the 

plants and nature of grade surface. The exhaust gases are hot enough to ignite grass, plants and shrubs located 

in the vicinity of termination. The grade surface must not be lawn.

5. If the unit is incorrectly vented or the air to fuel mixture is out of balance, a slight discoloration of the exterior 

of the house might occur. Since these factors are beyond the control of Sherwood Industries Ltd, we grant no 

guarantee against such incidents.

NOTE: Venting terminals shall not be recessed into walls or siding.

Installation

v

ent

 t

eRmination

 R

eQuiRements

:

IT IS RECOMMENDED THAT YOUR PELLET STOVE BE INSTALLED BY AN AUTHORIZED DEALER/INSTALLER. 

Figure 7: Use in conjunction with Table 2 for allowable exterior vent termination 

locations. 

Table 2: Use in conjunction with Figure 7 for allowable exterior vent termination locations. 

Letter

Minimum Clearance

Description

A

24 in (61 cm)

Above grass, top of plants, wood, or any other combustible materials.

B

48 in  (122 cm) 

Beside/below any door or window that may be opened. (18” (46 cm) if outside 

fresh air installed.) 

C

12 in (30 cm)

Above any door or window that may be opened. (9” (23 cm) if outside fresh air 

installed.) 

D

24 in (61 cm)

To any adjacent building, fences and protruding parts of the structure.

E

24 in (61 cm)

Below any eave or roof overhang

F

12 in (30 cm)

To outside corner.

G

12 in (30 cm)

To inside corner, combustible wall (vertical and horizontal terminations).

H

3 ft (91 cm) within a height 

of 15 ft (4.5 m) above the 

meter/regulator assembly

To each side of center line extended above natural gas or propane meter/

regulator assembly or mechanical vent.

I

3 ft (91 cm)

From any forced air intake of other appliance

J

12 in (30 cm)

Clearance to non-mechanical air supply inlet to building, or the combustion air 

inlet to any appliance.

K

24 in (61 cm)

Clearance above roof line for vertical terminations.

L

7 ft (2.13 m)

Clearance above paved sidewalk or paved driveway located on public property.

Air Supply Inlet

Gas Meter

Restriction Zone

(Termination not allowed)

Termination Cap

G

G

Opens

Opens

Opens

D

F

B

B

A

I

H

K

G

G

L

C

E

1. Do not terminate the 

vent in any enclosed or 

semi-enclosed areas such 

as a carport, garage, 

attic, crawlspace, narrow 

walkway, closely fenced 

area, under a sundeck 

or porch, or any location 

that can build up a 

concentration of fumes 

such as stairwells, covered 

breezeway, etc.

2. Vent surfaces can become 

17

Содержание M55-FS-2

Страница 1: ...TY DAMAGE BODILY INJURY OR EVEN DEATH Contact your building or fire officials about restrictions and installation inspection requirements in your area W A R R A N T Y R E G I S T R A T I O N e n v i r...

Страница 2: ...Pallet 15 Clearances to Combustibles 16 Levelling Leg Adjustment 16 Thermostat Installation 16 Vent Termination Requirements 17 Outside Fresh Air Connection 18 Exhaust and Fresh Air Intake Locations...

Страница 3: ...tove needing to be cleaned daily A low ash fuel may allow longer intervals between cleaning CLINKERING clinkers are silica sand or other impurities in the fuel that will form a hard mass during the bu...

Страница 4: ...wood pellet has a manufacturer set minimum low burn rate that must not be altered It is against federal regulations to alter this setting or otherwise operate this pellet heater in a manner inconsiste...

Страница 5: ...again until you are certain the chimney and its lining have not been damaged OPERATION The door and ash drawer must be kept closed when the unit is in operation to prevent fume spillage and for prope...

Страница 6: ...bearing capacity if existing construction doesn t meet load capacity suitable measures e g load distributing plate must be taken to achieve it DO NOT INSTALL A FLUE DAMPER IN THE EXHAUST VENTING SYSTE...

Страница 7: ...15 5KW hr Table 1 M 55 FS Specifications Description Fuel type Residential Pellet Heater 6mm dia Pellets wood corn wheat barley Voltage Current Max Power 110 120 V 4 2 Amps 504 Watts Frequency Hopper...

Страница 8: ...l is Yellow The Light flashes during start up and when the Thermostat is in control of the Unit The Light stops flashing when the Exhaust Sensor closes 6 HEAT OUTPUT INDICATOR Shows the present Heat L...

Страница 9: ...ll not operate for the first five 5 minutes after the ON button has been pressed After the five 5 minutes it will pulse at the same interval as the feed auger When the start up sequence is complete th...

Страница 10: ...grill are removed for clarity Operating Instructions Figure 6 Slider Damper Plate in Unit Figure 7 Efficient Flame This unit is designed to operate within a negative pressure range that may only be ad...

Страница 11: ...ut Lowering the cover position will decrease output and raising it will increase output CAUTION Increasing output too much can cause the high limit sensor to trip flashing 4 If this occurs lower the p...

Страница 12: ...of the agitator towards the back of the firebox to unlock it slide it to the left and lift it out of the burn pot liner 4 Lift the burn pot liner out of the stove 5 Lift the burn pot from the firebox...

Страница 13: ...ing may come loose To repair this glue the gasketing on using high temperature fiberglass gasket glue available from your local dealer This is important to maintain an airtight assembly ASH BOX Weekly...

Страница 14: ...otors has sealed bearings DO NOT lubricate this motor Check gaskets and replace if needed POST SEASON CLEAN UP Once you are finished using the pellet appliance for the season unplug the stove for adde...

Страница 15: ...to be installed on a carpeted area a solid surface wood metal or approved hearth pad must be installed between the unit and the carpet 6 This unit uses large quantities of air for combustion outside F...

Страница 16: ...a location that is not too close to the unit but will effectively heat the desired area 2 Connect the Thermostat or Timer using a 2 x 18 gauge wire from the unit to the thermostat If the heat in the...

Страница 17: ...ination locations Table 2 Use in conjunction with Figure 7 for allowable exterior vent termination locations Letter Minimum Clearance Description A 24 in 61 cm Above grass top of plants wood or any ot...

Страница 18: ...irtight homes and mobile homes When connecting to an outside fresh air source do not use plastic or combustible pipe A 3 minimum 76 mm ID inside diameter steel aluminum or copper pipe or ducting shoul...

Страница 19: ...ter to the floor using the four 4 holes in the pedestal Ensure the unit is electrically grounded to the chassis of your home permanently Do not install in a room people sleep in Outside fresh air is m...

Страница 20: ...fastened with at least three 3 screws 1 Place the appliance 15 37 5 cm away from the wall If the stove will be installed a hearth pad set the unit on it 2 Locate the center of the exhaust pipe on the...

Страница 21: ...tallations have 3 to 5 feet 91 to 152 cm of vertical pipe in the system to help naturally draft the unit in the event of extreme weather or a power outage Some horizontal through wall installations ma...

Страница 22: ...Vertical section of vent pipe Horizontal frame for thimble 90o elbow Concrete Wall Clean out tee Installation to use if there is a concrete or retaining wall in line with exhaust vent on pellet stove...

Страница 23: ...stallations section and then finish it by performing the following refer to Figure 16 1 Install a tee with clean out on the outside of the house 2 Install PL vent upward from the tee Make sure that yo...

Страница 24: ...hen the pellet vent is installed vertically it will meet the minimum clearance from a combustible wall stated by the vent manufacturer 2 Install the tee with clean out 3 Install the pellet vent upward...

Страница 25: ...imney If holes already exist fresh air intake can be taken through back of the fireplace or through the ash dump Installation Hearth Mount Installation Figure 18 Hearth Mount Side View Figure 19 Heart...

Страница 26: ...ided to attach the kit to the rear of the unit as shown Please see kit instruction manual for more detailed installation instructions The stove must also be connected to an existing 6 flue where permi...

Страница 27: ...If the 3 light is flashing unit may be out of fuel Check the Door and Ash Pan door THEY MUST BE CLOSED TIGHT See section 8 The Fuel will not light Check the fuse on the circuit board If the unit still...

Страница 28: ...the ON OFF button 5 Unit is on but auger motor does not turn at all Check the line fuse to see if it has blown Check the Door and Ash Pan door THEY MUST BE CLOSED TIGHT If the Auger gear box does not...

Страница 29: ...eaves fresh unburned fuel in the burn pot liner the fire is going out before the stove shuts off Trim the combustion air down to decrease the magnahelic pressure Turn the Heat Level up slightly poor q...

Страница 30: ...e Agitator Motor Grey Grey Orange Orange White Grey Grey White Blue Yellow Auger Motor White Yellow Vacuum Switch Connect Thermostat Here Brown Brown Blue Purple Yellow Red Thermostat Combustion Blowe...

Страница 31: ...Coupler 50 1697 6 Convection Blower 80mm 50 2064 7 Enviro Gel Decal 50 322 8 Auger With Paddles 50 1161 9 Ignitor Coil Type 400 Watt 50 2142 10 Auger Stops Clear Rubber 50 1559 11 Auger Plate And Bush...

Страница 32: ...Set of 2 50 2047 39 Exhaust Starter Tube Including Gasket 50 2043 40 Auger Tube Cover 50 1410 41 Hopper Lid Including Hinge 50 2037 42 Firebox Top 50 2040 43 Agitator Drive Bracket 50 2038 44 Cast Fl...

Страница 33: ...33 Parts Diagram Components 27 1 2 3 4 5 6 7 8 9 10 12 13 11 14 15 16 17 18 19 22 21 20 25 24 23 26...

Страница 34: ...Parts Diagram Steel 55 56 57 58 34 35 47 40 33 32 31 30 29 28 54 51 52 53 49 50 48 46 44 41 45 43 42 39 36 37 38 34...

Страница 35: ...als for which the unit is not certified by the EPA and void if not operated according to the Owner s Manual Exclusions An expanded list of exclusions is available at www enviro com help warranty html...

Страница 36: ...L NUMBER ___________________________ DATE OF PURCHASE _____________ dd mm yyyy DATE OF INSTALLATION ___________ dd mm yyyy MAGNEHELIC AT INSTALL ___________________ INSTALLER S SIGNATURE _____________...

Отзывы: