background image

Figure 9: M55C-FPI Heat Exchanger Cleaning.

Routine Cleaning and Maintenance

Heat eXcHangeR tubes 

(Weekly)

The exchanger tube scraper rod handle is located above 

the firebox door. Move the handle all the way in and out 

a few times (ONLY WHEN THE UNIT IS COLD) in order 

to  clean  away  any  fly  ash  that  may  have  collected  on 

the heat exchanger tubes. As different types of pellets 

produce different amounts of ash, cleaning of the tubes 

should be done on a regular basis to enable the unit to 

run efficiently.

DOOR GLASS CLEANING (Weekly) 
To  maintain  optimum  heat  transfer  through  the  glass, 

clean it weekly.  Cleaning of the glass must only be done 

when stove is cold. Open the door by lifting the handle. 

The  glass  can  be  cleaned  by  wiping  down  the  outside 
and inside of the glass with a dry soft cloth. 
Do not use abrasive cleaners.
If the glass has build up that can not be removed with only the cloth, clean the glass using paper towel 

and a gas appliance glass cleaner, this may be purchased through most dealers. If a gas appliance glass 

cleaner is not available, use a damp paper towel dipped in fly ash to clean the glass. After the glass has 

been cleaned use the dry soft cloth to wipe down the outside and inside of the glass. 

ASH PAN AND DOOR GASKETS (Weekly)
After extended use the gasketing may come loose. To repair this, glue the gasketing on using high-

temperature  fiberglass  gasket  glue  available  from  your  local  dealer.  This  is  important  to  maintain  an 

airtight assembly. 

ASH PAN (Weekly)
IMPORTANT: The unit must be OFF while the ash pan is removed.
The ash pan is located behind the lower castings (see Figure 10). To remove the ash pan, swing the cast  

front door out to the left, rotate the ash pan latch to the left and pull the ash drawer out towards you.  

Reach inside and pull the ash pan tray out.
Dump the ashes into a metal container stored away from combustibles. Monitor the ash level every week. 

Remember that different pellet fuels will have different ash contents. Ash content is a good indication of 

fuel efficiency and quality.  Refer to “

S

afety

 W

arningS

 a

nd

 r

ecommendationS

” for disposal of ashes. Vacuum 

the inside of the ash pan compartment. Insert the ash pan fully and reverse the previous steps. 
DO NOT PLACE UNBURNED OR RAW PELLET FUEL IN ASH PAN.

EXHAUST VENT (Biannually)
This vent should be cleaned every year or after two tons of pellets. We recommend contacting your 

dealer for professional cleaning.  To clean the vent pipe, tap lightly on the pipe to dislodge any loose ash.  

Open the bottom of the “T” to dump the ash, then vacuum as much of the ash out of the vent pipe as 

possible.

FRESH AIR INTAKE (Biannually)
Inspect periodically to be sure that it is not clogged with any foreign materials.

Front castings
removed for 
clarity

13

Содержание M55-FPIs640

Страница 1: ...LD RESULT IN PROPERTY DAMAGE BODILY INJURY OR EVEN DEATH Contact your building or fire officials about restrictions and installation inspection requirements in your area W A R R A N T Y R E G I S T R...

Страница 2: ...o Locate Your Pellet Appliance 16 Removing Pellet Stove From Pallet 16 Installing the Inset Frame and Levelling 17 Clearances to Combustibles 18 Thermostat Installation 18 Vent Termination Requirement...

Страница 3: ...ove needing to be cleaned daily A low ash fuel may allow longer intervals between cleaning CLINKERING clinkers are silica sand or other impurities in the fuel that will form a hard mass during the bur...

Страница 4: ...15 2015 Under specific test conditions this heater has been shown to deliver heat at rates ranging from 9 200 45 500 Btu hr Emissions Rating Label Serial No DATE OF MANUFACTURE J F M A M J J A S O N...

Страница 5: ...again until you are certain the chimney and its lining have not been damaged OPERATION The door and ash drawer must be kept closed when the unit is in operation to prevent fume spillage and for prope...

Страница 6: ...y suitable measures e g load distributing plate must be taken to achieve it DO NOT INSTALL A FLUE DAMPER IN THE EXHAUST VENTING SYSTEM OF THIS UNIT DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING A...

Страница 7: ...pe Residential Pellet Heater 6mm dia Pellets wood corn wheat barley Voltage Current Max Power 110 120 V 4 2 Amps 504 Watts Frequency Hopper Capacity Consumption on Low 60 Hz up to 50 lb 22 7 Kg 1 5 lb...

Страница 8: ...feed settings When pressed all lights on Heat Level Indicator will come on except the one that is the set point Hold Trim Button down and press the UP or DOWN Heat Level Arrow to adjust setting 3 Lig...

Страница 9: ...t operate for the first five minutes after the ON button has been pressed After the ten minutes it will pulse at the same interval as the feed auger When the start up sequence is complete the unit wil...

Страница 10: ...water column 37 42 Pa This can be measured using a Magnahelic pressure gauge once the unit has been running on heat level 5 setting after one hour of burn time This adjustment is necessary for varyin...

Страница 11: ...o adjust this cover either up or down to control the maximum output of 55 000 BTU Lowering the cover position will decrease output and raising it will increase output CAUTION Increasing output too muc...

Страница 12: ...it 3 The agitator locks at the right rotate the top of the agitator towards the back of the firebox to unlock it slide it to the left and lift it out of the burn pot liner 4 Lift the burn pot liner o...

Страница 13: ...use the gasketing may come loose To repair this glue the gasketing on using high temperature fiberglass gasket glue available from your local dealer This is important to maintain an airtight assembly...

Страница 14: ...N CLEAN UP Once you are finished using the pellet appliance for the season unplug the stove for added electrical protection It is very important that the stove be cleaned and serviced as stated above...

Страница 15: ...2 Close up of Front Rail Quick Release Pin Thumb Screw 1 Remove Cast Ash Drawer Front 2 Slide open the Cast Top 3 Lift off Cast Sides 4 Clip Side Rails to unit 5 Attach Front Rail using the quick rele...

Страница 16: ...l units installed in Mobile and Air Tight Homes R2000 or where required by local codes 7 Do not obtain combustion air from an attic garage or any unventilated space Combustion air may be obtained from...

Страница 17: ...e length of the bolts masonry bricks may be placed under the frame 4 Once level position the Insert Frame in the fireplace cavity so that the Surround Panel is flush with the front of the fireplace 5...

Страница 18: ...matically O will drop down t will return to pre and it will restar To Turn Off Stov AUTO OFF mo Pour d marrer qualit de supe carburants App pot de br lure h Pour faire fonct MODE HIGH L tre ajust s L...

Страница 19: ...llowable exterior vent termination locations Table 2 Use in conjunction with Figure 6 for allowable exterior vent termination locations Letter Minimum Clearance Description A 24 in 61 cm Above grass t...

Страница 20: ...mes When connecting to an outside fresh air source do not use plastic or combustible pipe A 3 minimum 76 mm ID inside diameter steel aluminum or copper pipe or ducting should be used The inlet must ha...

Страница 21: ...Chimneys 6 It is necessary to permanently seal any opening between the masonry of Figure 9 Masonry fireplace installation the fireplace and the facing masonry When installing the insert into a masonry...

Страница 22: ...from the fireplace from entering the chimney which will affect proper drafting of appliance Figure 10 Masonry fireplace positive flue installation A qualified installer should evaluate the existing fi...

Страница 23: ...st be supported with sheet metal studs and have no combustible material in the air space All venting for Built In installation must use PL or L venting and be installed with vent manufacturer s recomm...

Страница 24: ...st caused by airflow around the structure Follow vent manufacturer guidelines for installation clearance to combustibles and sealing of venting High temp Sealant must be used when connecting vent pipe...

Страница 25: ...nation Installation Figure 12 Venting horizontally with rise NOTE This venting configuration is only for use with the Built In installation Wall framing Wall thimble Termination cap Vertical section o...

Страница 26: ...PL vent upward from the tee Make sure that you install support brackets to keep the vent straight and secure All joints in the exhaust venting system must be fastened with at least three 3 screws 3 I...

Страница 27: ...in the exhaust venting system must be fastened with at least three 3 screws 3 Install ceiling thimble and secure the flashing as you go through the roof 4 Ensure that the rain cap is approximately 24...

Страница 28: ...If the 3 light is flashing unit may be out of fuel Check the Door and Ash Pan door THEY MUST BE CLOSED TIGHT See section 8 The Fuel will not light Check the fuse on the circuit board If the unit still...

Страница 29: ...require vertical section to move termination into a low pressure zone To reset Circuit Board after a trouble code push the ON OFF button 5 Unit is on but auger motor does not turn at all Check the li...

Страница 30: ...of the Heat Level button make sure the thermostat is calling for heat Call your local dealer for service 10 The stove keeps going out If the stove goes out and leaves fresh unburned fuel in the burn p...

Страница 31: ...Grey Grey Orange Orange White Grey Grey White Blue Yellow Auger Motor White Yellow Vacuum Switch Connect Thermostat Here Brown Brown Blue Purple Yellow Red Thermostat Combustion Blower Black Black Whi...

Страница 32: ...uger Collar with Screw 50 968 14 Auger Motor 2rpm 50 2054 15 Exhaust Motor Capacitor including Strap 50 2053 16 Agitator Drive Shaft with Sprocket 50 1698 17 Motor Drive Sprocket 50 1700 18 Auger Moto...

Страница 33: ...of 2 50 2294 54 Bearings with Mounting Bolts Set of 4 50 2295 55 M55C FPI Milan Empress FPI 2 Amp Small Fuse 50 2302 56 M55C FPI Milan Empress FPI 4 Amp Small Fuse Ignitor 50 2303 57 Agitator Drive B...

Страница 34: ...2276 68 M55C FPI Cast Ash Door Chestnut 50 2282 68 M55C FPI Cast Ash Door DB 50 2299 69 M55C FPI Cast Surround Trim Only PD 50 2272 69 M55C FPI Cast Surround Trim Only Beach 50 2278 69 M55C FPI Cast...

Страница 35: ...Parts Diagram Components 6 48 1 2 3 4 8 23 14 10 11 15 9 29 21 7 42 24 12 54 25 17 16 18 40 5 22 45 41 49 47 52 53 13 19 20 37 35...

Страница 36: ...Parts Diagram Steel 69 70 38 28 57 26 27 63 5 62 61 36 51 59 66 67 68 64 65 30 37 39 44 36...

Страница 37: ...Notes 37...

Страница 38: ...Notes 38...

Страница 39: ...cluding serial number Exclusions An expanded list of exclusions is available at www enviro com help warranty html This warranty does not cover Damage as a result of improper usage or abuse Damage caus...

Страница 40: ..._____________________ DATE OF PURCHASE _____________ dd mm yyyy DATE OF INSTALLATION ___________ dd mm yyyy MAGNEHELIC AT INSTALL ___________________ INSTALLER S SIGNATURE ____________________________...

Отзывы: