When planning your installation, it will be necessary to select the proper length of vent pipe for your particular requirements. It 
is important to note when passing through a wall, the maximum allowable wall thickness is 10-inches (254 mm), 1 ½ inches 
clearance to combustibles must be maintained. Select the amount of vertical rise desired for “vertical-to-horizontal” type 
installations. To determine the length of vent pipe required for vertical installations, measure the distance from the appliance 
flue outlet to the ceiling, the ceiling thickness, the vertical rise through the attic or second story, and allow for sufficient vent 
height above the roofline. For two story applications, a fire stop is required at each floor level. If an offset is needed in the attic, 
additional pipe and elbows will be required. To connect the venting system to the appliance flue outlet, a twist-lock adapter is 
built into the appliance at the factory. 

HORIZONTAL INSTALLATION 

STEP 1

Set the appliance in the desired location. Check to determine if wall studs or roof rafters are in the way when the 

venting system is attached. If this is the case, you may want to adjust the location of the appliance. 

 

STEP 2

Direct vent pipe and fittings are designed with special twist-lock connections. Assemble the desired combination of 

black pipe and elbows to the appliance adapter with pipe seams oriented towards the wall or floor, as much out of 
view as possible. 

Place a bead of Mil-Pac on the outer edge of the inner exhaust pipe (non-flared end). Place a bead of high temperature 
silicone on the male edge of the outer pipe. Push the pipe sections completely together, then twist-lock one section clockwise 
approximately one-quarter turn, until the two sections are fully locked. The female locking lugs will not be visible from the 
outside, on black pipe. They may be located by examining the inside of the female ends as shown in FIG-10. 

NOTE:

 

  
 

(1)

 Twist-lock procedure: four indentations, located on the female 

end of the pipes and fittings, are designed to slide straight onto 
the male ends of adjacent pipes and fittings, by orienting the 
four pipe indentations so they match and slide into the four 
entry slots on the male end. 

 

 
(2)

 Horizontal runs of vent pipe must be supported every three 

feet. Wall straps are available for this purpose. When running 
horizontal pipe clearances to combustibles must be maintained 
(2in. 

TOP

. 1 ½ in. 

SIDES

. 1 ½in.  

BOTTOM.

 

FIG. 10 

 
 
 
 

FIG.10 

 

STEP 3

.

 With the pipe attached to the stove into the correct location, mark the wall for a 10-inch x 10- inch square hole. The 

center of the square hole should match the centerline of the horizontal pipe. Cut and frame the 10-inch x 10-inch 
hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructed of non-
combustible material 

i.e. 

masonry or concrete, a 7-inch hole

 

is acceptable. 

 

STEP 4.

 Position the horizontal vent termination in the center of the 10-inch square hole, and attach to the exterior wall with 

the four screws provided. Before attaching the Vent Termination to the exterior wall, run a bead of non-hardening 
mastic around the edges, so as to make a seal between the termination and the wall. The arrow on the vent 
termination should be pointing up, insure that the proper clearances to combustible materials are maintained. 

 

STEP 5

Before connecting the horizontal run of the vent pipe to the vent termination, slide the

 

black decorative wall thimble 

cover over the vent pipe. 

 
STEP 6

Slide the appliance and vent assembly towards the wall, carefully inserting the vent pipe into the cap assembly. It is 

important that the vent pipe extend into the vent cap a sufficient distance with a minimum of 1 ¼inch overlap. Secure 
the connection between the vent cap pipe and the vent cap by attaching the two sheet metal straps extending from 
the vent cap assembly into the outer wall of the vent pipe. Use the two sheet metal screws provided to connect the 
straps to the vent pipe. Bend any remaining portion of the sheet metal straps back towards the vent cap, so the 
decorative wall thimble FIG-13 will conceal it. 

 

7

Содержание EG-40

Страница 1: ...on may result causing property damage personal injury or loss of life installation and service must be performed by a qualified installer service agency or the gas supplier Do not store or use gasolin...

Страница 2: ...tallation must conform to local codes or in the absence of local codes with the current CAN1 B 149 installation code in Canada or the current National Fuel Gas Code ANSI Z223 1 in the USA To prevent i...

Страница 3: ...IGH ALTITUDE SPECS ENVIRO EG 40 DIRECT VENT UNITS Have all been certified for use with either natural or propane gases See control panel and rating label Are not for use with solid fuels Must not be c...

Страница 4: ...aintenance Locate a position where the flue system of the stove can be properly installed without damaging the integrity of the building E g cutting a wall or ceiling joist The stove can be installed...

Страница 5: ...inimum K Clearance to a mechanical air supply inlet 6 feet 1 8m minimum L Clearance above paved side walk or paved driveway located on public property 7 feet 2 1m minimum M Clearance under verandah po...

Страница 6: ...PERMITTED TO REACH THE OUTSIDE VENT TERMINATION BEFORE BEGINNING THE INSTALLATION TAKE CARE TO ENSURE AN APPROPRIATE OUTSIDE LOCATION FOR THE VENT TERMINATION CAN BE ACCOMMODATED FOLLOW THE VENT LENG...

Страница 7: ...dentations located on the female end of the pipes and fittings are designed to slide straight onto the male ends of adjacent pipes and fittings by orienting the four pipe indentations so they match an...

Страница 8: ...nts excessive heat from possibly melting the vinyl siding material Note that the horizontal vent termination bolts onto the flat portion of the vinyl siding standoff Shaded area in FIG 12 so that an a...

Страница 9: ...pipe and elbows may be utilized in the attic as well as above the roofline The galvanized finish is desirable above the roofline due to the higher corrosion resistance STEP 6 Once the pipe sections h...

Страница 10: ...t the second floor and any subsequent floors FIG 19 The opening should be framed to 10 inch x 10 inch inside dimensions in the same manner as shown in FIG 16 2 Any occupied areas above the first floor...

Страница 11: ...ide on a location for the unit that will meet any or all local code requirements Refer to sections in this manual Deciding Were To Locate Your Stove and Planning Your Installation Set the appliance in...

Страница 12: ...liner over collar secure the flex liner with 3 sheet metal screws evenly spaced Align all straight sections of pipe slipping all joints together and installing 3 sheet metal screws evenly spaced A sm...

Страница 13: ...nimum 4 flex liner to the top of the CLASS A chimney Placing a bead of high temperature silicone to the Simpson Cap adapter and securely attach the flex liner to the adapter Secure the cap adapter to...

Страница 14: ...t is very important to install these logs in their correct position to insure safe optimum operating conditions Open the door of the fireplace Place the logs on the log supports Close the door and tig...

Страница 15: ...f all electrical power to the appliance 3 Turn the gas control knob clockwise to the off position 4 Open door Wait five 5 minutes to clear out any gas Close door If you smell gas including near the fl...

Страница 16: ...first 4 hours of use See page 14 After that depending upon the amount of use cleaning should be required no more than two or three times per season To clean the door use a mild glass cleaner and a so...

Страница 17: ...d Bleed line Check gas line pressure Contact dealer Burners will not remain lit Problem with thermopile circuit Check gas line pressure Check for flame impingement on thermopile if low see Pilot will...

Страница 18: ...the current edition of the National Fuel Gas Code ANSI Z223 1 UPON CONNECTION MARK APPROPRIATE FUEL TYPE ON WARNOCK HERSEY RATING LABEL LOCATED ON THE INSIDE OF THE RIGHT HAND SIDE PANEL Manifold Pres...

Страница 19: ...ly to the floor WARNING ELECTRICAL GROUNDING INSTRUCTIONS This appliance is equipped with a three prong grounding plug for your protection against shock hazard and should be plugged into a properly gr...

Страница 20: ...Voltage Thermostat REMOVING THE BLOWER 20 1 Turn the unit off and remove the log set 2 Remove the burner tray assembly by removing the screw on either side of the tray between the front and rear burne...

Страница 21: ...lot orifice First remove the two 2 T 20 Torx screws that hold the pilot assembly to the burner tray Lift the pilot assembly from the burner tray Using a 10mm wrench disconnect the pilot line from the...

Страница 22: ...ts only thereafter The paint on the Metal Brick Liner may peel This is due to the extreme conditions applied to the paint and is no way covered under warranty Your dealer shall make all claims under t...

Страница 23: ...g Harness Complete 2 pieces 30 014 Freestanding Burner Control NG Complete EC 040 Freestanding Fan Control Knob 30 015 Freestanding Burner Control LP Complete EC 043 IEC Power Cord 30 017 Rear Burner...

Страница 24: ...r 2003 EG40 GAS TRAY AND DOOR ASSEMBLIES Rear Venturi EG40 099 S I T Nova 820 Valve EC 006 NG EC 007 LPG S I T Piezo Ignitor EC 023 Burner Switch EC 025 Light Switch EC 066 FS Fan Controller EF 045 FS...

Страница 25: ...ing Side Panel Cabinet EG40 086 Flue Pipe Freestanding Pedestal Wiring Plate Freestanding Pedestal Box Cover EG40 307 1x1 Side Cabinet Hinge EC 054 Freestanding Side Panel Cabinet EG40 086 Convection...

Страница 26: ..._________ Name of Installer ___________________________________________ Address _______________________________________ ___________________________________________ ____________________________________...

Отзывы: