TO TEST VALVE PRESSURES (INPUT RATES):
The pressure taps are located on the front side of the valve (see Figure 33).
1. Using a long flat bladed screwdriver, turn set screw counter-clockwise to loosen.
2. Place
5
/
16
in (8 mm) I.D. hose over the pressure taps.
3. Check pressures using a manometer.
4. When finished, remove hose and tighten set screw.
Always check for gas leaks with a soap and water solution after completing the required
pressure test.
NEVER USE AN OPEN FLAME FOR LEAK TESTING.
28
Initial Installation
QUALIFIED INSTALLERS ONLY
1
2
3
I
tem
n
umber
D
escrIptIon
1
Pilot Adjustment
Screw
2
Inlet Pressure Test
Point
3
Outlet Pressure Test
Point
Figure 33: Valve Details.
Table 6: Valve Details.
Содержание E30GI
Страница 26: ...26 Initial Installation QUALIFIED INSTALLERS ONLY 5 of 10 Figure 30 Wiring Schematic ...
Страница 44: ...44 Parts Diagram Components 1 15 2 13 3 4 16 6 7 12 5 14 19 8 20 18 17 11 10 9 ...
Страница 45: ...45 Parts Diagram Options 22 26 23 24 27 25 28 21 29 ...
Страница 46: ...46 NOTES ...