32
• Connections
Select high-quality network cable, peel the isolation surface, Select 4 wires (brown, white brown, orange,
white orange), then follow the same order with the press pliers push into the 4-wire RJ11 crystal head.
Figure 30:
4-line RJ11
4-line RJ11 wire No.
Wire color
1
Brown
2
White Brown
3
Orange
4
White Orange
Connect the system as below (figure 31), so you can easy monitor the PV power station.
rS485
webbox
Ethernet
LAN
PC
hub
internet
LAN
Figure 31:
Enfinity Manager Monitoring diagram
Содержание 1000TL
Страница 39: ...Notes ...