
Installation
900-0258-01-00 Rev A
17
6. Before installing the top module #4, install 2 red insulators with M3 screws near the
center of the top front of module #4 frame, in the gap between the two support bars
installed earlier. Install cover on top of module #4. Then install #4 module on top of
module #3.
Figure 10 Install Insulators and Top Cover
M8 Bolt
Insulators
M3 x 8 screws (12)
Top Lid
M3 x 8 screws (6)
Содержание Outback Power EnergyCell 1000XLC
Страница 1: ...EnergyCell 1000XLC Owner s Manual...
Страница 10: ...Introduction 10 900 0258 01 00 Rev A This page intentionally left blank...
Страница 28: ...Operation 28 900 0258 01 00 Rev A NOTES...
Страница 32: ...Troubleshooting and Maintenance 32 900 0258 01 00 Rev A NOTES...
Страница 35: ...EnergyCell Batteries 900 0258 01 00 Rev A 35 This page intentionally left blank...
Страница 36: ...Masters of the Off Grid First Choice for the New Grid 17825 59th Avenue N E Suite B Arlington WA 98223 USA...