Installation
900-0258-01-00 Rev A
15
4. Anchor module #1, which will be the bottom module of the assembled cabinet, onto a
strong and level mounting surface (concrete floor is ideal). Keep at least a 2" (5 cm) gap
between the module and any wall to allow air circulation. Follow these steps to anchor
the module:
a. Mark the position of the four mounting holes on the floor and drill a
9
/
16
" (14 mm)
diameter hole 2¾" (70 mm) deep in each of the four positions. Clean any dust or
debris from the holes.
b. Position module #1 so the holes in the metal tabs attached to the outer beams
previously fastened to the module frame align with the holes in the floor. Gently
hammer an M12 expansion bolt into each hole, stopping when the bolt reaches the
bottom of the hole.
c. Thread a nut onto each bolt and torque to 80 lbf
⋅
ft
(107.8
N
⋅
m
or 1100 kgf
⋅
cm).
Figure 8
Mount Bottom Module
M12 Expansion Bolts
Содержание Outback Power EnergyCell 1000XLC
Страница 1: ...EnergyCell 1000XLC Owner s Manual...
Страница 10: ...Introduction 10 900 0258 01 00 Rev A This page intentionally left blank...
Страница 28: ...Operation 28 900 0258 01 00 Rev A NOTES...
Страница 32: ...Troubleshooting and Maintenance 32 900 0258 01 00 Rev A NOTES...
Страница 35: ...EnergyCell Batteries 900 0258 01 00 Rev A 35 This page intentionally left blank...
Страница 36: ...Masters of the Off Grid First Choice for the New Grid 17825 59th Avenue N E Suite B Arlington WA 98223 USA...