Installation
900-0258-01-00 Rev A
13
Installation Procedure
1. Install 4 support bars on module frame and fasten with M5 screws (3 screws per bar).
The set of 2 bars closest to the positive battery terminals should be installed adjacent to
each other, while the bars closest to the negative terminals should be installed with their
outer ends flush with the outer edge of the module frame and a gap in the module center
between the two bars.
Figure 6
Install Support Bars
Support Bars
M5 Screws
M5 Screws
Содержание Outback Power EnergyCell 1000XLC
Страница 1: ...EnergyCell 1000XLC Owner s Manual...
Страница 10: ...Introduction 10 900 0258 01 00 Rev A This page intentionally left blank...
Страница 28: ...Operation 28 900 0258 01 00 Rev A NOTES...
Страница 32: ...Troubleshooting and Maintenance 32 900 0258 01 00 Rev A NOTES...
Страница 35: ...EnergyCell Batteries 900 0258 01 00 Rev A 35 This page intentionally left blank...
Страница 36: ...Masters of the Off Grid First Choice for the New Grid 17825 59th Avenue N E Suite B Arlington WA 98223 USA...