![Energy Wall U-ERV 1200 Скачать руководство пользователя страница 55](http://html1.mh-extra.com/html/energy-wall/u-erv-1200/u-erv-1200_installation-operation-and-maintenance-manual_2410756055.webp)
ENERGYWALL.COM
INSTALLATION, OPERATION & MAINTENANCE MANUAL 717.814.5365
53
ENERGY WALL
TM
U-ERV/U-HRV
To ensure optimal system performance over its lifespan, it is recommended to follow the below general
maintenance procedures and timelines.
In all situations, electrical power supply must be disconnected
prior to servicing the unit.
General Maintenance
•
Clear any debris within the unit’s airstreams whenever the system is serviced.
•
Verify all access panels are properly secured and all fasteners are tightened to the required
specifications.
•
Ensure there is no air leakage between fan cubes or ducting and verify any duct sealant is not
dried or cracking.
•
Inspect all moving parts for obstructions or irregularities. Correct as needed prior to restarting
the system.
•
Inspect filters every month and replace at a minimum of once every three months or sooner.
Service Log
Date
Description of Service
Service
Representative
SERVICE &
MAINTENANCE
GENERAL MAINTENANCE
Содержание U-ERV 1200
Страница 2: ......