38
Version: January 2013
1.
The reset button
(see Figure 4-65-(2))
must be pressed
after the test has been completed so that the unit can
be used again.
1.
Plug in the device and switch on.
The displayed symbol
(see Figure 4-5-(8))
indicates the re-
sult:
Symbol
Significance
Yellow
Insulation fault (≤ 23 kΩ)
stays off
Connected unit is OK
Table 4.3: Insulation monitoring whilst running without switching off
If an insulation fault exists and the unit was previously
OK when tested without a device connected (see insula-
tion monitoring above), the insulation fault has been
caused by the device.
2.
The reset button
(see Figure 4-6-(1))
must be pressed after
switching off and disconnecting the consumer so that the
unit can be operated again.
Action
Operation
Press once
Acknowledge the buzzer
Press twice
Reset ISO
4.7.2
Insulation monitoring with switch off
The following requirements must be met:
Generator started
1.
Unplug the device
2.
The circuit breaker must be in Pos. 1.
3.
Press the test button
see Figure 4-6-(1))
The displayed symbol
(see Figure 4-5-(9))
and the position
of the circuit breaker indicate the result:
Symbol
Result
Significance
lights up red
Circuit breaker jumps to Pos. 0 and the
generator cuts out
Insulation monitoring is OK
stays off
Circuit breaker stays in Pos. 1 and the
generator continues to run
Insulation monitoring is defective
Table 4.4: Insulation monitoring plus switching off
The insulation monitoring test has been run.
Insulation monitoring
whilst running:
Function
reset/acknowledgement
button:
Requirements
Testing the insulation
monitoring:
Содержание ESE 608 DHG ES DI DUPLEX
Страница 1: ...OPERATING INSTRUCTIONS ESE 608 DHG ES DI DIN SILENT Article No 151312 156312...
Страница 3: ...Contents Status at January 2013 3 Table of Contents List of illustrations List of tables...
Страница 20: ...20 Version January 2013 Notes...
Страница 25: ...Status at January 2013 25 Notes...
Страница 44: ...44 Version January 2013 Notes...
Страница 49: ...Status at January 2013 49 Notes...