RID14
Installation
Hauser
11
4.2.2
Installation location
Information on conditions that must be present at the installation location to mount the
device correctly can be found in Section 'Technical data'. These include the ambient
temperature, degree of protection, climate class etc.
4.3
Installation instructions
The device can be mounted directly on the wall → 11. A mounting bracket is available
for mounting on a pipe → 4, 12.
The backlit display can be mounted in 4 different positions → 11.
4.3.1
Turning the display
90°
90°
90°
Pos. 2
Pos. 3
Pos. 4
Pos. 1
2
3
1
4
A0023724
3
Field indicator, 4 display positions, can be fitted in 90° stages
The display unit can be turned in 90 ° stages.
1. First remove the cover clamp (1) and the housing cover (2).
2. Then disconnect the display (3) from the electronics unit (4).
3. Turn the display to the desired position and then fit it onto the electronics unit.
4.3.2
Mounting directly on the wall
Proceed as follows to mount the device directly on the wall:
1. Drill 2 holes
2. Fit the device on the wall with 2 screws (⌀5 mm (0.2 in)).
4.3.3
Pipe mounting
The mounting bracket is suitable for pipes with a diameter between 1.5" to 3.3".
The additional mounting plate must be used for pipes with a diameter between 1.5" to 2.2".
The mounting plate is not needed for pipes with a diameter between 2.2" to 3.3".
Proceed as follows to mount the device on a pipe:
Содержание RID14
Страница 2: ......
Страница 29: ...RID14 Maintenance Endress Hauser 29 8 Maintenance No special maintenance work is required on the device...
Страница 54: ......
Страница 55: ......
Страница 56: ...www addresses endress com...