Proline Promass E 300 HART
Installation
Hauser
29
6. Screw on the connection compartment cover.
7. Depending on the device version: Attach the securing clamp of the connection
compartment cover.
6.2.5
Turning the display module
The display module can be turned to optimize display readability and operability.
N
ic
h
t
u
n
te
r
ar
e
ö
ffn
e
n
+
E
ESC
–
1.
2.
N
ic
h
t
u
n
te
r
ar
e
ö
ffn
e
n
+
E
ESC
–
3.
3 mm
+
E
ESC
–
A0030035
1. Depending on the device version: Loosen the securing clamp of the connection
compartment cover.
2. Unscrew the connection compartment cover.
3. Turn the display module to the desired position: max. 8 × 45° in each direction.
4. Screw on the connection compartment cover.
5. Depending on the device version: Attach the securing clamp of the connection
compartment cover.
6.3
Post-installation check
Is the device undamaged (visual inspection)?
Does the measuring device conform to the measuring point specifications?
For example:
• Process temperature → 189
• Process pressure (refer to the section on "Pressure-temperature ratings" in the "Technical
Information" document)
• Ambient temperature
• Measuring range
Has the correct orientation for the sensor been selected ?
• According to sensor type
• According to medium temperature
• According to medium properties (outgassing, with entrained solids)
Does the arrow on the sensor nameplate match the direction of flow of the fluid through the
piping → 23?
Are the measuring point identification and labeling correct (visual inspection)?
Is the device adequately protected from precipitation and direct sunlight?
Are the securing screw and securing clamp tightened securely?
Содержание Proline Promass E 300 HART
Страница 140: ...Operation Proline Promass E 300 HART 140 Endress Hauser Display channel 2 Display channel 3 Display channel 4...
Страница 211: ......
Страница 212: ...www addresses endress com 71505952 71505952...