Proline Promass E 300 HART
Commissioning
Hauser
77
10
Commissioning
10.1 Function check
Before commissioning the measuring device:
‣
Make sure that the post-installation and post-connection checks have been performed.
• "Post-installation check" checklist→ 29
• "Post-connection check" checklist → 41
10.2 Switching on the measuring device
‣
After a successful function check, switch on the measuring device.
After a successful startup, the local display switches automatically from the startup
display to the operational display.
If nothing appears on the local display or a diagnostic message is displayed, refer to
the section on "Diagnostics and troubleshooting" → 143.
10.3 Setting the operating language
Factory setting: English or ordered local language
X X X X
X X X
X
X
20.50
Operation
Setup
Main menu
0104-1
Display language
English
Español
Français
Display language
English
Deutsch
Ã
0104-1
Ã
Español
Français
Display language
English
Deutsch
0104-1
Betrieb
Setup
Hauptmenü
Sprache
Deutsch
0104-1
XX
XX
1.
2.
3.
4.
A0029420
29
Taking the example of the local display
10.4 Configuring the measuring device
• The
Setup
menu with its guided wizards contains all the parameters needed for standard
operation.
• Navigation to the
Setup
menu
Содержание Proline Promass E 300 HART
Страница 140: ...Operation Proline Promass E 300 HART 140 Endress Hauser Display channel 2 Display channel 3 Display channel 4...
Страница 211: ......
Страница 212: ...www addresses endress com 71505952 71505952...