
Installation
Liquiline System CA80PH
26
Hauser
Foundation plan for version with base
5.2
Post-installation check
• After mounting, check all the connections to ensure they are secure and leak-tight.
• Make sure that the hoses of the sample preparation system cannot be removed from the hose
glands unless additional force is applied.
• Visually inspect all the hose connections to ensure everything is correct.
a0021043
Fig. 19: Foundation plan
A
Fasteners (4 x M10)
---
Dimensions of Liquiline System CA80
624 (24.57)
417 (16.42)
530 (20.87)
297 (1
1.70)
A
A
A
A
A
Содержание Liquiline System CA80PH
Страница 2: ......
Страница 208: ...www addresses endress com ...