Wiring
CCS120
12
Hauser
4.2
Connection via junction box
To lengthen the sensor connection you require the junction box VBM (Fig. 5, Fig. 6) . The
connection is lengthened to the transmitter using the special measuring cable CYK71.
4.3
Post-connection check
C07-COS41xxx-04-05-00-en-003.eps
Fig. 5: Junction box VBM, side view
C07-COS41xxx-04-05-00-en-004.eps
Fig. 6: Junction box VBM, top view
Instrument status and specifications
Remarks
Are the sensor, assembly, junction box or cable damaged?
Visual inspection
Electrical connection
Remarks
Does the supply voltage of the transmitter match the specifications on the
nameplate?
110/230 V AC
24 V AC/DC
Are the installed cables strain-relieved and not twisted?
Is the cable type route completely isolated?
Power cable/weak current cable
Are the power supply and signal cable correctly connected to the
transmitter?
Use the connection diagram of
CCM2x3.
Are all the screws terminals properly tightened?
Are all the cable entries installed, tightened and sealed?
For lateral cable entries : cable loops
downwards for water to be able to drip off.
Are all the cable entries installed downwards or lateral?
54/2.13
mm/inch
Pg 13,5
52/2.05
80/3.15
113/4.45
125/4.92
62.5/2.46
10/0.09
136/5.35
mm/inch