AMETEK CTS
VDS 200Q10 Series
Manual for Operation
V 1.00
6 / 35
9
LED OUTPUT ACTIVE
This LED is on during the power on status.
10 Test Supply
Output to the DUT or other generators.
4mm banana connectors.
11 Cooling
Grid with fans for cooling behind. Ensure nothing blocks the air circulation (distance > 0.5m)
2.2. Rear view VDS 200Q10.x
1
TEST SUPPLY OUT
8
Mains switch
2
SENSE
9
Mains fuse
3
Reference ground connection
10
Mains input
4
Cooling
11
IEEE 488.1
5
FRAME BUS
12
USB port
6
TRIGGER IN
13
CN interface
7
ANALOG IN
14
FAIL1 / FAIL2
1
TEST SUPPLY OUT
Output to DUT
2
Sense
Sense lines to compensate voltage drop across connection VDS
– DUT (max. 4V)
Note: Sense lines are only supported for VDS 200Q10.1 models and higher.
3
Reference ground connection
Massive metal ground point to be connected to a reference ground point in the system during testing.
4
Cooling
Grid with or without fans for cooling behind. Ensure you do not block these grids.
Minimum distance to a wall or other blocking objects >20cm