
31455-4-1113
Page 18
VENTING FIREPLACE - TOP
Below Grade Installation
When it is not possible to meet the required vent terminal clearances
of 12” (305mm) above grade level, a snorkel kit is recommended.
It allows installation depth down to 7” (178mm) below grade level.
The 7” (178mm) is measured from the center of the horizontal vent
pipe as it penetrates through the wall.
Ensure the sidewall venting clearances are observed. If venting
system is installed below ground, we recommend a window
well with adequate and proper drainage to be installed around
the termination area.
TYPICAL BASEMENT INSTALLATION
Figure 23
Examples of possible venting systems using one 90° elbow. Eight
feet is listed as minimum vertical vent run with 20 feet of maximum
horizontal vent run. Vertical dimensions are based on centerline to
centerline of pipe. Horizontal dimensions are based on centerline
of pipe to end of termination.
Figure 24
Examples of possible venting systems using two 90° elbows.
V is listed as minimum vertical dimensions and H1 + H2 is listed
as total of maximum horizontal dimensions. The maximum vertical
and horizontal distances for two 90° elbows as shown in
Figure
25
is 20 feet.
Attention: Refer to Figure 22 for additional venting requirements.
Figure 25
Содержание DVP42 Series
Страница 20: ...31455 4 1113 Page 20 Figure 29 Figure 30 Figure 31 EXAMPLES TOP VENT RUN...
Страница 42: ...31455 4 1113 Page 42 Figure 75 MILLIVOLT SYSTEM STANDING PILOT WIRING DIAGRAM...
Страница 54: ...31455 4 1113 Page 54 INTERMITTENT PILOT CONTROL SYSTEM TROUBLESHOOTING...
Страница 64: ...31455 4 1113 Page 64 PARTS VIEW...