
39359-0-1018
Page 78
1. Using gloves, unpack liner components and check for damaged
or missing components.
2. Lower bottom louver and remove upper louver on fireplace.
3. Remove glass frame assembly from fireplace.
4. Remove rear logs from burner assembly.
5. Place brick panel (rear) against rear wall in fireplace.
NOTE:
The top edge will have a half-moon cutout relief to match up
with the rear flue vent hole.
6. While holding finished edge on brick panel (side), place brick
panel (sides) against side walls in fireplace. Move side panels
rearward until the back edge meets the rear brick panel. Slide
side brick panels down so they rest on firebox bottom.
7. align grout lines on top brick panel with the grout lines on the
side brick panels. Place the top brick panel into brick panel
holder. With needle-nose pliers, carefully bend hold-down tabs
on brick panel holder over the edges of the top brick panel. The
hold-down tabs will securely hold the top brick panel in place.
8. Replace rear logs onto burner assembly. Refer to log placement,
page 40.
9. Attach glass frame assembly onto fireplace.
10. Raise bottom louver and replace top louver onto fireplace.
11. Installation of optional brick liner is complete.
*
JUNCTION BOX WIRING INSTALLATION INSTRUCTIONS
OPTIONAL BRICK LINER INSTALLATION INSTRUCTIONS
Figure 101
a factory installed junction box is located on the lower right side of
the fireplace. Wiring must be fed to the junction box and attached
to the receptacle that is provided. Leave approximately 6” of wire
in the junction box for connection.
attach black wire to one side of the receptacle and white wire to
opposite side of receptacle. The ground wire should be attached
to the green (ground) screw.
Install the receptacle into the junction box. attach cover plate.
CAUTION
All wiring should be done by a qualified electrician and shall
be in compliance with all local, city and state building codes.
Before making the electrical connection, make sure that main
power supply is disconnected. The appliance, when installed,
must be electrically grounded in accordance with local codes
or, in the absence of local codes, with the national electrical
code ansi/nfpa 70 (latest edition).
Содержание DVP FP3 4 Series
Страница 20: ...39359 0 1018 Page 20 Figure 30 Figure 31 EXAMPLES TOP VENT RUN Figure 29...
Страница 41: ...39359 0 1018 Page 41 1 Place Log A 1 onto two pins on rear log support as shown below LOG PLACEMENT DVP 42 48...
Страница 45: ...39359 0 1018 Page 45 5 Log assembly is completed LOG PLACEMENT DVP 42 48...
Страница 48: ...39359 0 1018 Page 48 Figure 74 MILLIVOLT SYSTEM STANDING PILOT WIRING DIAGRAM...
Страница 56: ...39359 0 1018 Page 56 INTERMITTENT PILOT CONTROL SYSTEM TROUBLESHOOTING...
Страница 83: ...39359 0 1018 Page 83 FIREPLACE SERVICE HISTORY Date Dealer Name Service Technician Name Service Performed Notes...