
39359-0-1018
Page 26
8" VENTING FRAMING AND FINISHING
Installing Support Brackets
a horizontal pipe support MUST BE used for each 3 feet of horizontal
run. The pipe supports should be placed around the pipe and nailed
in place to framing members. There MUST BE a 3 inch clearance
to combustibles above 8 inch diameter pipe and elbows and 1 inch
clearance on both sides and bottom of the 8 inch diameter pipe to
combustibles on all horizontal pipe sections and elbows.
Vertical runs of this vent systems must be supported every 4 feet
above the appliance flue outlet by wall brackets attached to the 8
inch vent pipe and secured with nails or screws to structural framing
members.
Figure 42
Installing Firestops
Firestops are required for safety whenever the vent system passes
through an interior wall, an exterior wall, or a ceiling. These firestops
act as a firebreak heat shield and as a means to insure that minimum
clearances are maintained to the vent system.
Horizontal runs in the vent system which pass through either interior
or exterior walls, require the use of wall firestops on both sides of
the wall through which the vent passes.
Cut an appropriate sized hole in the wall.
See Figure 43.
Position
the firestop on the interior side of the wall for the hole.
Attention:
Wall firestop hole is off-set towards bottom of wall
opening. Secure with nails or screws. Continue the vent run through
the firestop.
See Figure 43
.
Figure 43
Vertical runs of this system which pass through ceilings require
the use of ONE ceiling firestop at the hole in each ceiling through
which the vent passes.
Position a plumb bob directly over the center of the vertical vent
component and mark the ceiling to establish the center point of the
vent. Drill a hole or drive a nail through this center point and check
the floor above for any obstructions such as wiring or plumbing
runs. Reposition the appliance and vent system, if necessary, to
accommodate ceiling joists and/or obstructions.
Cut a 10 1/2 inch x 10 1/2 inch hole through the ceiling, using the
center point previously marked. Frame the hole with framing lumber
the same size as the ceiling joists.
See Figure 44
. If the area above
the ceiling is NOT an attic, position and secure the ceiling firestop on
the ceiling side of the previously cut and framed hole.
See Figure
45
. If the area above the ceiling is an attic, position and secure the
firestop on top of the previously framed hole.
See Figure 46.
NOTE:
Remove insulation from the framed area in the attic before
installing the firestop and/or vent pipes.
Содержание DVP FP3 4 Series
Страница 20: ...39359 0 1018 Page 20 Figure 30 Figure 31 EXAMPLES TOP VENT RUN Figure 29...
Страница 41: ...39359 0 1018 Page 41 1 Place Log A 1 onto two pins on rear log support as shown below LOG PLACEMENT DVP 42 48...
Страница 45: ...39359 0 1018 Page 45 5 Log assembly is completed LOG PLACEMENT DVP 42 48...
Страница 48: ...39359 0 1018 Page 48 Figure 74 MILLIVOLT SYSTEM STANDING PILOT WIRING DIAGRAM...
Страница 56: ...39359 0 1018 Page 56 INTERMITTENT PILOT CONTROL SYSTEM TROUBLESHOOTING...
Страница 83: ...39359 0 1018 Page 83 FIREPLACE SERVICE HISTORY Date Dealer Name Service Technician Name Service Performed Notes...