
9
2) Clip earth clamp to exposed metal of your 3-phase appliance.
3) Check that PAC-3P is switched ON (Figure 1 – Button 9).
4) Please use the “SELECT” button until “GO: APPLIANCE TEST” is selected on
screen.
5) Press “GO” to confirm.
6) Press “GO” – The PAC-3P will check earth continuity (Rpe < 1
Ω
is a PASS).
7) Press “SELECT” – If Rpe = PASS it will continue to the next stage of testing.
If Rpe = FAIL the PAC-3P will exit the testing procedure.
NOTE: If the Rpe has failed please check and verify your earth clamp connection.
8) Connect the PAC-3P mains plug (20A or 32A, depending on which test socket you
are using) to an appropriate 3-phase power supply.
NOTE: Do NOT press “SELECT”, unless you want to exit the test.