15
21. Type mA (milliamps)
22. Press “Enter” to confirm.
23. Press “OK” to return to the editing menu.
24. Press “Esc” and save changes (OK).
25. Press “Esc” again to exit to the main screen.
26. Sequence is now created.
Recording Results and Printing Tags
1. From the Main menu/screen Press F4
2. Select “Auto Mode (New Test)”
3. Confirm the Asset ID no is appropriate
4. Select the “3 Phase Leakage” test sequence that you created
5. Enter in the Site and Location details for the appliance/lead
6. Confirm Re-Test period is appropriate
7. Press “OK” to commence the test.
8. Confirm the Visual Inspection
9. Perform the Leakage test
10. Type in the measured reading (e.g. 2.60 mA)
11. Indicate PASS/FAIL (Press Pass or Fail).
12. Enter in Descriptions, Make, Model and Notes as required and then hit Save.
13. Press “Print” to print the Tag
(NOTE: the printer should automatically pair to the PrimeTest 300 while you are
testing).