background image

 

1.0 Introduction 

The  PAC-3P  is  a  portable,  battery  powered  3  phase  stand-alone  test  instrument  for 
performing  earth  continuity  and  earth  leakage  current  tests  as  required  by  AS/NZS  3760, 
including: 

Earth continuity @ 200mA 
Leakage Current Test – Mains-powered 

The unit conducts a sequence test, starting with an earth continuity test and then proceeding 
with the leakage test. It indicates Pass/Fail and the actual measured readings on the LCD 
display and provides on-screen user prompts. It includes safety features such as preventing 
a leakage current test in event of a failed earth continuity test result. 20A and 32A extension 
lead test adaptor  is  included  with  an  earth test pin  terminal,  which eliminates  the need for 
probing of the extension lead earth. 

 

2.0 PAC-3P Specifications 

Display LCD 
Indication PASS/FAIL and measured values 
Operation 2 push buttons 

Earth Continuity Test: 
Display Range 
0.1ohm to 20ohm 
Test Current 200mA 
Pass/Fail Limit 1ohm 
Accuracy better than 5% at 1ohm 

Leakage Test: 
Display Range 
0.15mA to 9.99mA 
Pass/Fail Limit 5mA 
Accuracy better than 5% at 5mA 

Power Source 2x9V batteries 
Accessory 20A and 32A extension lead test adaptor with earth test pin 

 

3.0 User Note 

This instrument and its operating instructions are intended for use by adequately 
trained personnel who are AS3760 competent. 

It is important to follow the documentation and operating instructions to avoid danger. 

 

 

Содержание ProTag PAC-3P

Страница 1: ...1 ProTagTM PAC 3P 3 Phase Appliance Extension Lead Tester User Manual Made in Australia by Emona Instruments Pty Ltd www emona com au www protag com au...

Страница 2: ...User Note 3 4 0 Safety 4 5 0 Accessories 5 6 0 Unit Description 6 7 0 Using the PAC 3P Leakage Tester 8 7 3 1 Testing 3 Phase APPLIANCES 8 7 3 2 Testing 3 Phase EXTENSION LEADS 11 8 0 Recording Resul...

Страница 3: ...lt 20A and 32A extension lead test adaptor is included with an earth test pin terminal which eliminates the need for probing of the extension lead earth 2 0 PAC 3P Specifications Display LCD Indicatio...

Страница 4: ...ser manual the protection provided by the equipment could be impaired Read this user manual carefully otherwise the use of the instrument may be dangerous for the operator the instrument or for the eq...

Страница 5: ...e battery case back into the compartment 5 3 Cleaning Instructions You can clean the instrument regularly or as needed CAUTION Please ensure unit is OFFLINE and disconnected from mains power When the...

Страница 6: ...e 1 1 20A Plug to Mains 2 32A Plug to Mains 3 Earth Continuity Clamp 4 20A Test Socket for Appliances Leads 5 32A Test Socket for Appliances Leads 6 9V Battery Compartments 7 LCD Screen 8 GO test key...

Страница 7: ...7 6 2 PAC 3P ELA 3 PHASE EXTENSION LEAD TEST ADAPTOR Figure 2 1 20A Plug Test Lead 2 32A Plug Test Lead 3 Earth Test Pin Terminal Attach Earth Clamp Here 1 2 3...

Страница 8: ...es 7 2 Preliminary Electrical Safety Check Always ensure that the appliance or lead under test is electrically isolated 7 3 Earth Continuity Leakage Current Measurements WARNINGS For leakage current m...

Страница 9: ...will check earth continuity Rpe 1 is a PASS 7 Press SELECT If Rpe PASS it will continue to the next stage of testing If Rpe FAIL the PAC 3P will exit the testing procedure NOTE If the Rpe has failed...

Страница 10: ...seconds the measurement will be displayed on screen and indicate whether it is a PASS or FAIL 12 Turn off the 3 Phase mains supply and then safely disconnect the PAC 3P from the 3 Phase mains socket...

Страница 11: ...that is easily accessed on the outside of the case so that probing of the 3 phase plug is not required It is designed to prevent the user from probing the earth clamp into the wrong terminal and there...

Страница 12: ...p 5 Press the SELECT button until GO LEAD TEST is selected on screen 6 Press GO to proceed 7 Press GO and the tester will conduct the Earth Continuity test 8 Press SELECT If Rpe PASS it will continue...

Страница 13: ...appear on screen 11 Press GO to proceed with current leakage measurement After a few seconds the measurement will be displayed on screen and indicate PASS or FAIL 12 Turn off the 3 Phase Mains supply...

Страница 14: ...est sequence has been created highlight new test sequence and select Edit Renaming New Test Sequence 8 Press Edit 9 Type in a new name e g 3 Phase Leakage Log Press Enter 10 Hit OK Inserting Sequence...

Страница 15: ...te 4 Select the 3 Phase Leakage test sequence that you created 5 Enter in the Site and Location details for the appliance lead 6 Confirm Re Test period is appropriate 7 Press OK to commence the test 8...

Страница 16: ...bration For service and calibration please contact EMONA Instruments Pty Ltd 78 Parramatta Rd Camperdown NSW 2050 Tel 02 9519 3933 Fax 02 9550 1278 Email testinst emona com au Web www emona com au www...

Отзывы: