10
9) When MAINS is connected, the following message will appear on-screen.
10) Press “GO” to proceed with current leakage measurement.
11) After a few seconds, the measurement will be displayed on screen and indicate
whether it is a PASS or FAIL.
12) Turn off the 3 Phase mains supply and then safely disconnect the PAC-3P from the 3
Phase mains socket.
13) Record the reading in your logbook or on your logging tester.
For PrimeTest 300, refer to Section 7.4.
14) Press: “SELECT” to exit to the main menu.