background image

 

5.0 Accessories 

5.1 Standard Contents 

 
The PAC-3P tester is supplied with the following items: 

1 x PAC-3P unit 
1 x PAC-3P-ELA Extension Lead Test Adaptor Set (20A/32A) 
1 x User Manual 

5.2 Type of Batteries 

2 x 9V batteries 

Replacement of batteries: 

1.  Pull the battery compartment up (Figure 1 – No 6) 
2.  Withdraw battery from its case 
3.  Put a new 9V battery into the case 
4.  Insert the battery case back into the compartment 

5.3 Cleaning Instructions 

You can clean the instrument regularly or as needed. 
CAUTION: Please ensure unit is OFFLINE and disconnected from mains power. 

When the panel surface or cover becomes soiled, wet piece of soft cloth with a water-diluted 
neutral detergent and wipe the surface gently. 

Do not put volatile solvents such as thinner or benzene. They may discolour the unit surface 
coating and/or erase printed characters. 

Do not wipe any exposed metal with excessive liquid.  

After cleaning, wait until unit is completely dry prior to use. 

Содержание ProTag PAC-3P

Страница 1: ...1 ProTagTM PAC 3P 3 Phase Appliance Extension Lead Tester User Manual Made in Australia by Emona Instruments Pty Ltd www emona com au www protag com au...

Страница 2: ...User Note 3 4 0 Safety 4 5 0 Accessories 5 6 0 Unit Description 6 7 0 Using the PAC 3P Leakage Tester 8 7 3 1 Testing 3 Phase APPLIANCES 8 7 3 2 Testing 3 Phase EXTENSION LEADS 11 8 0 Recording Resul...

Страница 3: ...lt 20A and 32A extension lead test adaptor is included with an earth test pin terminal which eliminates the need for probing of the extension lead earth 2 0 PAC 3P Specifications Display LCD Indicatio...

Страница 4: ...ser manual the protection provided by the equipment could be impaired Read this user manual carefully otherwise the use of the instrument may be dangerous for the operator the instrument or for the eq...

Страница 5: ...e battery case back into the compartment 5 3 Cleaning Instructions You can clean the instrument regularly or as needed CAUTION Please ensure unit is OFFLINE and disconnected from mains power When the...

Страница 6: ...e 1 1 20A Plug to Mains 2 32A Plug to Mains 3 Earth Continuity Clamp 4 20A Test Socket for Appliances Leads 5 32A Test Socket for Appliances Leads 6 9V Battery Compartments 7 LCD Screen 8 GO test key...

Страница 7: ...7 6 2 PAC 3P ELA 3 PHASE EXTENSION LEAD TEST ADAPTOR Figure 2 1 20A Plug Test Lead 2 32A Plug Test Lead 3 Earth Test Pin Terminal Attach Earth Clamp Here 1 2 3...

Страница 8: ...es 7 2 Preliminary Electrical Safety Check Always ensure that the appliance or lead under test is electrically isolated 7 3 Earth Continuity Leakage Current Measurements WARNINGS For leakage current m...

Страница 9: ...will check earth continuity Rpe 1 is a PASS 7 Press SELECT If Rpe PASS it will continue to the next stage of testing If Rpe FAIL the PAC 3P will exit the testing procedure NOTE If the Rpe has failed...

Страница 10: ...seconds the measurement will be displayed on screen and indicate whether it is a PASS or FAIL 12 Turn off the 3 Phase mains supply and then safely disconnect the PAC 3P from the 3 Phase mains socket...

Страница 11: ...that is easily accessed on the outside of the case so that probing of the 3 phase plug is not required It is designed to prevent the user from probing the earth clamp into the wrong terminal and there...

Страница 12: ...p 5 Press the SELECT button until GO LEAD TEST is selected on screen 6 Press GO to proceed 7 Press GO and the tester will conduct the Earth Continuity test 8 Press SELECT If Rpe PASS it will continue...

Страница 13: ...appear on screen 11 Press GO to proceed with current leakage measurement After a few seconds the measurement will be displayed on screen and indicate PASS or FAIL 12 Turn off the 3 Phase Mains supply...

Страница 14: ...est sequence has been created highlight new test sequence and select Edit Renaming New Test Sequence 8 Press Edit 9 Type in a new name e g 3 Phase Leakage Log Press Enter 10 Hit OK Inserting Sequence...

Страница 15: ...te 4 Select the 3 Phase Leakage test sequence that you created 5 Enter in the Site and Location details for the appliance lead 6 Confirm Re Test period is appropriate 7 Press OK to commence the test 8...

Страница 16: ...bration For service and calibration please contact EMONA Instruments Pty Ltd 78 Parramatta Rd Camperdown NSW 2050 Tel 02 9519 3933 Fax 02 9550 1278 Email testinst emona com au Web www emona com au www...

Отзывы: