14
8.0 Recording Results on Seaward PrimeTest 300
This sequence will include a Visual Inspection and prompt for a log of the 3 phase leakage
current reading from the PAC-3P.
Creating New Test Sequence
Note: Perform once only
1. Turn “ON” PrimeTest 300 and wait for it to load up
2. Press Menu (F4)
3. Select “Configuration”
4. Select “Edit Test Sequences”.
5. Press Options (F3)
6. Select “Add New Sequence”.
7. A new test sequence has been created, highlight new test sequence and select
“Edit”.
Renaming New Test Sequence
8. Press “Edit”
9. Type in a new name (e.g. 3 Phase Leakage Log). Press “Enter”
10. Hit “OK”.
Inserting Sequence Details
11. Select “Insert” to add the Visual Inspection.
12. Select “Visual Test” from the drop-down box.
13. Press “OK”.
14. Scroll to “End”
15. Press “Insert” again to create “Leakage Current” log
16. Press the Right arrow (
) and scroll to “User Test”
17. Press “Select”
18. Change “User Test Name” from “Inspection” to “Leakage Current”.
19. Press “OK” to confirm
20. Move the cursor down to “User Test Units” and press the Right arrow (
).