The assemblies look similar. To tell the difference, note the air injection tee in the
discharge tubing assembly has a larger diameter barb than the reagent injection tee
in the suction tubing assembly.
7.
Install replacement sample inlet and drain tubing.
The sample inlet tubing is longer than the drain tubing.
10.3.4
Peristaltic pump tubing
The expected life of the peristaltic pump tubing is one year.
To replace pump tubing:
Procedure
1.
Turn off the sample and reagent pumps.
2.
The reagent and sample tubing is connected to the pump tubing with luer fittings.
Disconnect the fittings from the pump by turning the fitting in the direction of the
arrow.
.
Luer Fittings
Figure 10-5:
3.
Using your thumb and forefinger, gently pinch the sides of the pump cover. Slide the
cover upwards to remove it.
.
Maintenance
Instruction Manual
77
Содержание Rosemount TCL
Страница 4: ......
Страница 8: ...Contents iv Rosemount TCL ...
Страница 16: ...Description and specifications 8 Rosemount TCL ...
Страница 18: ...Principles of operation 10 Rosemount TCL ...
Страница 23: ...TCL Case Dimensions Figure 3 4 Reagent Tubing Assembly Figure 3 5 Installation Instruction Manual 15 ...
Страница 26: ...Installation 18 Rosemount TCL ...
Страница 34: ...Wiring 26 Rosemount TCL ...
Страница 46: ...Display and operation 38 Rosemount TCL ...
Страница 66: ...Programming the transmitter 58 Rosemount TCL ...
Страница 68: ...Digital communications 60 Rosemount TCL ...
Страница 106: ...Troubleshooting 98 Rosemount TCL ...