![Emerson Rosemount CT5800 Скачать руководство пользователя страница 169](http://html.mh-extra.com/html/emerson/rosemount-ct5800/rosemount-ct5800_manual_103727169.webp)
9
Preventative maintenance
9.1
Maintaining the analyzer
Preventative maintenance (PM) is also sometimes known as scheduled maintenance or
planned maintenance.
Observe and obey the all safety precautions when performing preventative maintenance
on the analyzer.
WARNING
BURNS
Some parts of the analyzer may be heated to 150 °F (65 °C). Failure to allow sufficient
cooling may cause serious burn injury to personnel.
Do not touch any part of the analyzer.
Assume all parts of the analyzer are hot unless it has been switched off and allowed to
cool down.
Always wear proper protective equipment when handling the analyzer.
Switch off the analyzer and allow it to cool for at least two hours before fitting,
removing, or performing any maintenance.
The analysis cell is insulated against heat loss. Allow the analyzer to cool for at least 12
hours before performing any maintenance on, or in the vicinity of, the analysis cell.
If burns occur, seek immediate medical treatment.
9.2
Scheduled maintenance
This schedule lists the tasks required by the analyzer and the recommended frequency.
Variation in customer sites may require these activities to be performed more or less often
than indicated. Details of the tasks to be performed are contained in
Table 9-1: Scheduled Checks
Frequency
Action
Monthly
1. Check the zero and span calibration. Perform the calibration more or
less frequently if necessary to meet quality control or plant
operation requirements.
Annually
1. Perform the monthly check detailed in the previous row.
2. Perform a laser wavelength calibration. Contact your local service
representative for guidance.
Reference Manual
Preventative maintenance
00809-0100-5800
September 2019
Rosemount CT5800
169
Содержание Rosemount CT5800
Страница 1: ...Reference Manual 00809 0100 5800 Rev AA September 2019 Rosemount CT5800 Continuous Gas Analyzer ...
Страница 20: ...Contents Reference Manual September 2019 00809 0100 5800 xx Emerson com Rosemount ...
Страница 34: ...Plan Reference Manual September 2019 00809 0100 5800 34 Emerson com Rosemount ...
Страница 46: ...Figure 2 6 Earth Bond Install Reference Manual September 2019 00809 0100 5800 46 Emerson com Rosemount ...
Страница 60: ...Startup procedure Reference Manual September 2019 00809 0100 5800 60 Emerson com Rosemount ...
Страница 70: ...Operating the analyzer Reference Manual September 2019 00809 0100 5800 70 Emerson com Rosemount ...
Страница 80: ...Verifying gas concentrations Reference Manual September 2019 00809 0100 5800 80 Emerson com Rosemount ...
Страница 90: ...Gas calibration Reference Manual September 2019 00809 0100 5800 90 Emerson com Rosemount ...
Страница 162: ...Troubleshooting and diagnostics Reference Manual September 2019 00809 0100 5800 162 Emerson com Rosemount ...
Страница 168: ...Shutdown procedure Reference Manual September 2019 00809 0100 5800 168 Emerson com Rosemount ...
Страница 170: ...Preventative maintenance Reference Manual September 2019 00809 0100 5800 170 Emerson com Rosemount ...
Страница 176: ...ATEX IECEx Assessment Report Summary Reference Manual September 2019 00809 0100 5800 176 Emerson com Rosemount ...
Страница 178: ...Theory of operation Reference Manual September 2019 00809 0100 5800 178 Emerson com Rosemount ...
Страница 180: ...Spare parts list Reference Manual September 2019 00809 0100 5800 180 Emerson com Rosemount ...
Страница 187: ...Engineering Drawings Reference Manual September 2019 00809 0100 5800 182 Emerson com Rosemount ...