41
25A Switch Mode Rectifier
NT5C06B / C Installation and User Manual
Installation and start-up procedures
Tools and test equipment
The following tools and test equipment are required:
•
Potentiometer screwdriver Bourns Inc. No. 32
•
Potentiometer screwdriver Bourns Inc. No. 60
•
Screwdriver 3 inch
•
Digital voltmeter - Fluke 8000 A or equivalent
•
Dummy load
Installation procedure
Procedure 1 - Power shelf installation
Step Action
1
Position the power shelf against the rack.
2
Fasten the shelf in the position indicated on the drawings (normally
directly below the Controller or below another power shelf).
3
Release the clamping bar from the front of the power shelf (Refer to
Figures 10, 11 and 12).
4
Remove the AC junction box cover (left side) and store for re-
installation.
5
Remove the DC and control wiring area cover (right side) and store for
re-installation.
–
end–
Содержание MPR15 Series
Страница 2: ......
Страница 4: ......
Страница 80: ...80 Maintenance UM5C06B C 169 2071 500 P0711722 Standard 10 00 May 2001 This page is left blank intentionally ...
Страница 100: ...100 References UM5C06B C 169 2071 500 P0711722 Standard 10 00 May 2001 This page is left blank intentionally ...
Страница 118: ...118 Abbreviations and acronyms 167 2071 500 Standard 8 0 May 1999 This page is left blank intentionally ...
Страница 119: ......