108 Appendix B: NT5C10CO shelf
UM5C06B / C ( 169-2071-500 ) P0711722 Standard 10.00 May 2001
6
5
4
3
2
1
OPEN
CLOSED
The above settings will provide a delay of approximately 24 hours, which is
sufficient to charge the batteries with a reserve of 80 to 120AH, and at the
same time supply power to a 10 A load. When the load is 6 A, or less on a
battery reserve of less than 80AH, open the SW1-4 and close the SW1-3 for a
delay of 12 hours.
Adjustment and verification
The following steps are required to verify the system’s operation.
CAUTION
The power system batteries must be fully charged to their
nominal voltage before proceeding with the following steps
.
Procedure 23 - Adjustment and verification
Step Action
1
Release the clamping bar of the power shelf by loosening the two
retaining screws.
2
Remove the right blank panel by removing the screw, pushing it up and
pulling it out.
3
Locate the timer SW1 switch on the circuit pack, then set the switches
as follows (see the following illustration).
4
Turn “ON” the DC and AC breakers of both rectifiers.
5
Verify that the rectifiers, float and equalize voltage levels are correct. If
necessary, adjust them to the battery manufacturer’s specifications.
continued
Содержание MPR15 Series
Страница 2: ......
Страница 4: ......
Страница 80: ...80 Maintenance UM5C06B C 169 2071 500 P0711722 Standard 10 00 May 2001 This page is left blank intentionally ...
Страница 100: ...100 References UM5C06B C 169 2071 500 P0711722 Standard 10 00 May 2001 This page is left blank intentionally ...
Страница 118: ...118 Abbreviations and acronyms 167 2071 500 Standard 8 0 May 1999 This page is left blank intentionally ...
Страница 119: ......