DVC6000 Digital Valve Controllers
September 2013
7-6
Figure 7-3. I/P Converter
W9328
SOCKET-HEAD
SCREWS (4)
(KEY 23)
SHROUD
(KEY 169)
I/P CONVERTER
(KEY 41)
BOOTS
(KEY 210)
Removing the I/P Converter
1. Remove the front cover (key 43), if not already
removed.
2. Refer to figure 7-3. Using a 2.5 mm hex socket
wrench, remove the four socket-head screws (key 23)
that attach the shroud (key 169) and I/P converter
(key 41) to the module base (key 2).
3. Remove the shroud (key 169); then pull the I/P
converter (key 41) straight out of the module base
(key 2). Be careful not to damage the two electrical
leads that come out of the base of the I/P converter.
4. Ensure that the O-ring (key 39) and screen
(key 231) stay in the module base and do not come
out with the I/P converter (key 41).
Replacing the I/P Converter
1. Refer to figure 7-2. Inspect the condition of the
O-ring (key 39) and screen (key 231) in the module
base (key 2). Replace them, if necessary. Apply
silicone lubricant to the O-rings.
2. Ensure the two boots (key 210) shown in figure 7-3
are properly installed on the electrical leads.
3. Install the I/P converter (key 41) straight into the
module base (key 2), taking care that the two electrical
leads feed into the guides in the module base. These
guides route the leads to the printed wiring board
assembly submodule.
4. Install the shroud (key 169) over the I/P converter
(key 41).
5. Install the four socket-head screws (key 23) and
evenly tighten them in a crisscross pattern to a final
torque of 1.6 N
m (14 lbf
in).
Figure 7-4. DIP Switch Location
BACK OF PWB ASSEMBLY
SUB-MODULE
DIP SWITCH
UP
DOWN
PINS REMOVED FOR CONNECTOR KEYING.
TRAVEL SENSOR
CONNECTOR
TERMINAL BOX
CONNECTOR
6. After replacing the I/P converter, calibrate travel or
perform touch-up calibration to maintain accuracy
specifications.
PWB (Printed Wiring Board) Assembly
Refer to figures 8-2 through 8-9 for key number
locations. The PWB assembly (key 50) is located on
the back of the module base assembly (key 2).
Note
If the PWB assembly submodule is
replaced, calibrate and configure
the digital valve controller to
maintain accuracy specifications.
Removing the Printed Wiring Board
Assembly
1. Separate the module base from the housing by
performing the Removing the Module Base procedure.
2. Remove three screws (key 33).
3. Lift the PWB assembly (key 50) straight out of the
module base (key 2).
4. Ensure that the O-rings (key 40) remain in the
pressure sensor bosses on the module base assembly
(key 2) after the PWB assembly (key 50) has been
removed.
7
Содержание Fisher FIELDVUE DVC6000
Страница 2: ......
Страница 22: ...DVC6000 Digital Valve Controllers September 2013 1 12 1 ...
Страница 82: ...DVC6000 Digital Valve Controllers September 2013 4 22 4 ...
Страница 94: ...DVC6000 Digital Valve Controllers September 2013 5 12 5 ...
Страница 139: ...Loop Schematics Nameplates September 2013 B 1 B B Appendix B Loop Schematics Nameplates B ...
Страница 161: ......