SEP 2005
MODEL 1000
INSTALLATION AND SETUP
3-96
3.6
SYSTEM START-UP
7
Perform Leak Checks
8
Purge Carrier Gas Lines
9
Purge Calibration Lines
10
Start Up GC System
»
To perform system start-up, follow these steps
:
(1)
For system start-up, run an analysis of the calibration gas.
(a)
Ensure that the Stream switch for the calibration gas has been set to AUTO (see last
step, previous section).
(2)
Run the GC System in "Single Stream" mode.
(a)
To operate the GC System with a PC and the software MON2000, refer to the
MON2000 Software for Gas Chromatographs User Manual
(P/N 3-9000-522).
or
(b)
To operate the GC System from the front panel keyboard and LCD, refer to Section
4, "Operation," this manual.
For
process
GC systems that handle multiple streams and are equipped with optional purge
system components, you must also set up solenoid purge flow prior to normal operation of the
GC system. For more information about this, along with a procedure for setting solenoid
purge flows, see Appendix E, this manual.
Содержание Daniel Danalyzer 1000
Страница 2: ......
Страница 18: ...SEP 2005 MODEL 1000 DESCRIPTION 1 6 Figure 1 1 GC System Functional Block Diagram ...
Страница 38: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 6 Figure 2 1 Analyzer Components ...
Страница 52: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 20 Figure 2 5 Block Diagram of GC Controller Circuit Boards ...
Страница 79: ...MODEL 1000 SEP 2005 INSTALLATION AND SETUP 3 25 Figure 3 3 Analyzer and GC Controller Interconnect Leads ...
Страница 115: ...MODEL 1000 SEP 2005 INSTALLATION AND SETUP 3 61 Channel 1 I O Connector J6 Figure 3 23 Channel 1 I O Connector J6 ...
Страница 116: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 62 Channel 2 I O Connector J6 Figure 3 24 Channel 2 I O Connector J6 ...
Страница 117: ...MODEL 1000 SEP 2005 INSTALLATION AND SETUP 3 63 Channel 3 I O Connector J3 Figure 3 25 Channel 3 I O Connector J3 ...
Страница 118: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 64 Channel 4 I O Connector J3 Figure 3 26 Channel 4 I O Connector J3 ...
Страница 146: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 92 Figure 3 37 Analyzer Components ...
Страница 188: ...SEP 2005 MODEL 1000 MAINTENANCE 5 20 Figure 5 2 Analyzer Components ...
Страница 213: ...MODEL 1000 SEP 2005 MAINTENANCE 5 45 Figure 5 7 Analog Loopback with More Than Two Analog Outputs ...
Страница 218: ...SEP 2005 MODEL 1000 MAINTENANCE 5 50 Figure 5 10 Analyzer and GC Controller Interconnect Leads ...
Страница 222: ...SEP 2005 MODEL 1000 MAINTENANCE 5 54 This page intentionally left blank ...
Страница 228: ...SEP 2005 MODEL 1000 LIST OF APPENDICES A ii This page intentionally left blank ...
Страница 254: ...SEP 2005 MODEL 1000 GUIDE TO TRANSIENT PROTECTION MODULES C 8 This page intentionally left blank ...
Страница 260: ...SEP 2005 MODEL 1000 SETTING SOLENOID PURGE FLOWS E 4 This page intentionally left blank ...
Страница 280: ...SEP 2005 MODEL 1000 2350 to 2350A CPU RETROFIT INSTRUCTIONS F 20 This page intentionally left blank ...
Страница 282: ...SEP 2005 MODEL 1000 ANALYZER DRAWINGS Addendum 1 2 This page intentionally left blank ...
Страница 283: ......
Страница 284: ......
Страница 285: ......
Страница 286: ......
Страница 287: ......
Страница 288: ......
Страница 289: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......
Страница 293: ......
Страница 294: ......
Страница 295: ......
Страница 296: ......
Страница 298: ...SEP 2005 MODEL 1000 GC CONTROLLER DRAWINGS Addendum 2 2 Block Diagram of GC Controller Circuit Boards ...
Страница 299: ......
Страница 300: ......
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ......
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ......
Страница 309: ......
Страница 310: ......
Страница 311: ......
Страница 312: ......
Страница 313: ......
Страница 314: ......
Страница 316: ......
Страница 318: ......
Страница 319: ......