SEP 2005
MODEL 1000
MAINTENANCE
5-4
5.2.1
GC System Maintenance Checklist
Date Performed ___ /___ / ___
Sales Order No. HE- __________
BI-MONTHLY
AS FOUND
AS LEFT
NOMINAL
CARRIER CYLINDER
Cylinder Pressure Reading (High)
____ psig
____ psig
Cylinder Pressure Outlet Reading
____ psig
____ psig
110 psig
CARRIER PRESSURE PANEL
REGULATOR
____ psig
N/A
85 psig
SAMPLE SYSTEM
Sample Line Pressure(s)
(1)___ psig
____ psig
20 psig
(2)___ psig
____ psig
20 psig
(3)___ psig
(4)___ psig
(5)___ psig
____ psig
____ psig
____ psig
20 psig
20 psig
20 psig
Sample Flows (Rotameter)
(1)___ cc/min
____ cc/min
40-60 cc
(2)___ cc/min
____ cc/min
40-60 cc
(3)___ cc/min
____ cc/min
40-60 cc
Calibration Gas
(4)___ cc/min
(5)___ cc/min
____ cc/min
____ cc/min
40-60 cc
40-60 cc
High Pressure Reading
____ psig
____ psig
Outlet Pressure Reading
____ psig
____ psig
20 psig
Flow (Rotameter)
____ cc/min
____ cc/min
40-60 cc/min
Содержание Daniel Danalyzer 1000
Страница 2: ......
Страница 18: ...SEP 2005 MODEL 1000 DESCRIPTION 1 6 Figure 1 1 GC System Functional Block Diagram ...
Страница 38: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 6 Figure 2 1 Analyzer Components ...
Страница 52: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 20 Figure 2 5 Block Diagram of GC Controller Circuit Boards ...
Страница 79: ...MODEL 1000 SEP 2005 INSTALLATION AND SETUP 3 25 Figure 3 3 Analyzer and GC Controller Interconnect Leads ...
Страница 115: ...MODEL 1000 SEP 2005 INSTALLATION AND SETUP 3 61 Channel 1 I O Connector J6 Figure 3 23 Channel 1 I O Connector J6 ...
Страница 116: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 62 Channel 2 I O Connector J6 Figure 3 24 Channel 2 I O Connector J6 ...
Страница 117: ...MODEL 1000 SEP 2005 INSTALLATION AND SETUP 3 63 Channel 3 I O Connector J3 Figure 3 25 Channel 3 I O Connector J3 ...
Страница 118: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 64 Channel 4 I O Connector J3 Figure 3 26 Channel 4 I O Connector J3 ...
Страница 146: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 92 Figure 3 37 Analyzer Components ...
Страница 188: ...SEP 2005 MODEL 1000 MAINTENANCE 5 20 Figure 5 2 Analyzer Components ...
Страница 213: ...MODEL 1000 SEP 2005 MAINTENANCE 5 45 Figure 5 7 Analog Loopback with More Than Two Analog Outputs ...
Страница 218: ...SEP 2005 MODEL 1000 MAINTENANCE 5 50 Figure 5 10 Analyzer and GC Controller Interconnect Leads ...
Страница 222: ...SEP 2005 MODEL 1000 MAINTENANCE 5 54 This page intentionally left blank ...
Страница 228: ...SEP 2005 MODEL 1000 LIST OF APPENDICES A ii This page intentionally left blank ...
Страница 254: ...SEP 2005 MODEL 1000 GUIDE TO TRANSIENT PROTECTION MODULES C 8 This page intentionally left blank ...
Страница 260: ...SEP 2005 MODEL 1000 SETTING SOLENOID PURGE FLOWS E 4 This page intentionally left blank ...
Страница 280: ...SEP 2005 MODEL 1000 2350 to 2350A CPU RETROFIT INSTRUCTIONS F 20 This page intentionally left blank ...
Страница 282: ...SEP 2005 MODEL 1000 ANALYZER DRAWINGS Addendum 1 2 This page intentionally left blank ...
Страница 283: ......
Страница 284: ......
Страница 285: ......
Страница 286: ......
Страница 287: ......
Страница 288: ......
Страница 289: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......
Страница 293: ......
Страница 294: ......
Страница 295: ......
Страница 296: ......
Страница 298: ...SEP 2005 MODEL 1000 GC CONTROLLER DRAWINGS Addendum 2 2 Block Diagram of GC Controller Circuit Boards ...
Страница 299: ......
Страница 300: ......
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ......
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ......
Страница 309: ......
Страница 310: ......
Страница 311: ......
Страница 312: ......
Страница 313: ......
Страница 314: ......
Страница 316: ......
Страница 318: ......
Страница 319: ......