MODEL 1000
SEP 2005
INSTALLATION AND SETUP
3-37
(a)
For the explosion-proof Controller
, the front panel is secured by 16 screws. Remove
those screws first.
(b)
Then carefully lower the front panel on its bottom hinges. The front panel is heavy,
so make sure it does not drop and cause damage.
(c)
For the rack mount Controller
, the rear of the enclosure is open; it allows access for
most field wiring procedures without removing the enclosure.
(4)
Locate the GC Controller's Terminal Board for Field Wiring (TB). The TB is attached to the
GC Controller's card cage assembly, facing the enclosure's front panel. (In the rack mount
Controller, the TB faces outward toward the rear of the enclosure.)
(5)
Route the Analyzer-Controller Interconnect Cable appropriately, especially in the case of the
purged Controller enclosure.
Figure 3-6. Separate Conduit Entries for Cable In/Out of GC Controller
(6)
Make Interconnect Cable wiring connections to the GC Controller TB as listed earlier (see
Section 3.3.1, Table 3-2).
Содержание Daniel Danalyzer 1000
Страница 2: ......
Страница 18: ...SEP 2005 MODEL 1000 DESCRIPTION 1 6 Figure 1 1 GC System Functional Block Diagram ...
Страница 38: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 6 Figure 2 1 Analyzer Components ...
Страница 52: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 20 Figure 2 5 Block Diagram of GC Controller Circuit Boards ...
Страница 79: ...MODEL 1000 SEP 2005 INSTALLATION AND SETUP 3 25 Figure 3 3 Analyzer and GC Controller Interconnect Leads ...
Страница 115: ...MODEL 1000 SEP 2005 INSTALLATION AND SETUP 3 61 Channel 1 I O Connector J6 Figure 3 23 Channel 1 I O Connector J6 ...
Страница 116: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 62 Channel 2 I O Connector J6 Figure 3 24 Channel 2 I O Connector J6 ...
Страница 117: ...MODEL 1000 SEP 2005 INSTALLATION AND SETUP 3 63 Channel 3 I O Connector J3 Figure 3 25 Channel 3 I O Connector J3 ...
Страница 118: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 64 Channel 4 I O Connector J3 Figure 3 26 Channel 4 I O Connector J3 ...
Страница 146: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 92 Figure 3 37 Analyzer Components ...
Страница 188: ...SEP 2005 MODEL 1000 MAINTENANCE 5 20 Figure 5 2 Analyzer Components ...
Страница 213: ...MODEL 1000 SEP 2005 MAINTENANCE 5 45 Figure 5 7 Analog Loopback with More Than Two Analog Outputs ...
Страница 218: ...SEP 2005 MODEL 1000 MAINTENANCE 5 50 Figure 5 10 Analyzer and GC Controller Interconnect Leads ...
Страница 222: ...SEP 2005 MODEL 1000 MAINTENANCE 5 54 This page intentionally left blank ...
Страница 228: ...SEP 2005 MODEL 1000 LIST OF APPENDICES A ii This page intentionally left blank ...
Страница 254: ...SEP 2005 MODEL 1000 GUIDE TO TRANSIENT PROTECTION MODULES C 8 This page intentionally left blank ...
Страница 260: ...SEP 2005 MODEL 1000 SETTING SOLENOID PURGE FLOWS E 4 This page intentionally left blank ...
Страница 280: ...SEP 2005 MODEL 1000 2350 to 2350A CPU RETROFIT INSTRUCTIONS F 20 This page intentionally left blank ...
Страница 282: ...SEP 2005 MODEL 1000 ANALYZER DRAWINGS Addendum 1 2 This page intentionally left blank ...
Страница 283: ......
Страница 284: ......
Страница 285: ......
Страница 286: ......
Страница 287: ......
Страница 288: ......
Страница 289: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......
Страница 293: ......
Страница 294: ......
Страница 295: ......
Страница 296: ......
Страница 298: ...SEP 2005 MODEL 1000 GC CONTROLLER DRAWINGS Addendum 2 2 Block Diagram of GC Controller Circuit Boards ...
Страница 299: ......
Страница 300: ......
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ......
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ......
Страница 309: ......
Страница 310: ......
Страница 311: ......
Страница 312: ......
Страница 313: ......
Страница 314: ......
Страница 316: ......
Страница 318: ......
Страница 319: ......