MODEL 1000
SEP 2005
INSTALLATION AND SETUP
3-93
Figure 3-38. Analyzer Valve Switches, Upper Enclosure
(3)
Ensure that all of the Analyzer Valve Switches, upper enclosure, are set to the AUTO
position.
(4)
Ensure that the carrier gas bottle valve is open.
(5)
Set the carrier gas line pressure at 110 psig. Use the dual stage regulator at the carrier gas
bottle to adjust pressure.
Do not use the "Carrier Pressure Adjust" valve (on the Flow Panel of the Analyzer) to adjust
carrier gas line pressure. That valve is factory-set and should not be adjusted.
(6)
Allow the Analyzer system temperature to stabilize and the carrier gas lines to become fully
purged with carrier gas.
(a)
A period of 4 to 8 hours (or overnight) is recommended, during which all of the
settings described in steps (1) through (5) are maintained. No other settings should
be made.
Содержание Daniel Danalyzer 1000
Страница 2: ......
Страница 18: ...SEP 2005 MODEL 1000 DESCRIPTION 1 6 Figure 1 1 GC System Functional Block Diagram ...
Страница 38: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 6 Figure 2 1 Analyzer Components ...
Страница 52: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 20 Figure 2 5 Block Diagram of GC Controller Circuit Boards ...
Страница 79: ...MODEL 1000 SEP 2005 INSTALLATION AND SETUP 3 25 Figure 3 3 Analyzer and GC Controller Interconnect Leads ...
Страница 115: ...MODEL 1000 SEP 2005 INSTALLATION AND SETUP 3 61 Channel 1 I O Connector J6 Figure 3 23 Channel 1 I O Connector J6 ...
Страница 116: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 62 Channel 2 I O Connector J6 Figure 3 24 Channel 2 I O Connector J6 ...
Страница 117: ...MODEL 1000 SEP 2005 INSTALLATION AND SETUP 3 63 Channel 3 I O Connector J3 Figure 3 25 Channel 3 I O Connector J3 ...
Страница 118: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 64 Channel 4 I O Connector J3 Figure 3 26 Channel 4 I O Connector J3 ...
Страница 146: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 92 Figure 3 37 Analyzer Components ...
Страница 188: ...SEP 2005 MODEL 1000 MAINTENANCE 5 20 Figure 5 2 Analyzer Components ...
Страница 213: ...MODEL 1000 SEP 2005 MAINTENANCE 5 45 Figure 5 7 Analog Loopback with More Than Two Analog Outputs ...
Страница 218: ...SEP 2005 MODEL 1000 MAINTENANCE 5 50 Figure 5 10 Analyzer and GC Controller Interconnect Leads ...
Страница 222: ...SEP 2005 MODEL 1000 MAINTENANCE 5 54 This page intentionally left blank ...
Страница 228: ...SEP 2005 MODEL 1000 LIST OF APPENDICES A ii This page intentionally left blank ...
Страница 254: ...SEP 2005 MODEL 1000 GUIDE TO TRANSIENT PROTECTION MODULES C 8 This page intentionally left blank ...
Страница 260: ...SEP 2005 MODEL 1000 SETTING SOLENOID PURGE FLOWS E 4 This page intentionally left blank ...
Страница 280: ...SEP 2005 MODEL 1000 2350 to 2350A CPU RETROFIT INSTRUCTIONS F 20 This page intentionally left blank ...
Страница 282: ...SEP 2005 MODEL 1000 ANALYZER DRAWINGS Addendum 1 2 This page intentionally left blank ...
Страница 283: ......
Страница 284: ......
Страница 285: ......
Страница 286: ......
Страница 287: ......
Страница 288: ......
Страница 289: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......
Страница 293: ......
Страница 294: ......
Страница 295: ......
Страница 296: ......
Страница 298: ...SEP 2005 MODEL 1000 GC CONTROLLER DRAWINGS Addendum 2 2 Block Diagram of GC Controller Circuit Boards ...
Страница 299: ......
Страница 300: ......
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ......
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ......
Страница 309: ......
Страница 310: ......
Страница 311: ......
Страница 312: ......
Страница 313: ......
Страница 314: ......
Страница 316: ......
Страница 318: ......
Страница 319: ......