MODEL 1000
SEP 2005
INSTALLATION AND SETUP
3-21
Figure 3-1. Behind the Valve Driver Board is the Interconnect Board Containing TB-4
(3)
Loosen and remove the four (4) thumbscrews that hold the Valve Driver Board.
(4)
Carefully edge the Valve Driver Board off the holding screws. Do not disconnect the Valve
Driver Board from the cable; merely let the board rest face down, secured by the cable (see
Figure 3-2).
(5)
With the Analyzer TB-4 now exposed, connect thirteen of the Interconnect Cable’s fifteen
leads to terminals 11 through 23. See Table 3-2 and Figure 3-3 for purposes and destinations
of leads. Also see “CAUTION”, step (6)(a).
Содержание Daniel Danalyzer 1000
Страница 2: ......
Страница 18: ...SEP 2005 MODEL 1000 DESCRIPTION 1 6 Figure 1 1 GC System Functional Block Diagram ...
Страница 38: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 6 Figure 2 1 Analyzer Components ...
Страница 52: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 20 Figure 2 5 Block Diagram of GC Controller Circuit Boards ...
Страница 79: ...MODEL 1000 SEP 2005 INSTALLATION AND SETUP 3 25 Figure 3 3 Analyzer and GC Controller Interconnect Leads ...
Страница 115: ...MODEL 1000 SEP 2005 INSTALLATION AND SETUP 3 61 Channel 1 I O Connector J6 Figure 3 23 Channel 1 I O Connector J6 ...
Страница 116: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 62 Channel 2 I O Connector J6 Figure 3 24 Channel 2 I O Connector J6 ...
Страница 117: ...MODEL 1000 SEP 2005 INSTALLATION AND SETUP 3 63 Channel 3 I O Connector J3 Figure 3 25 Channel 3 I O Connector J3 ...
Страница 118: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 64 Channel 4 I O Connector J3 Figure 3 26 Channel 4 I O Connector J3 ...
Страница 146: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 92 Figure 3 37 Analyzer Components ...
Страница 188: ...SEP 2005 MODEL 1000 MAINTENANCE 5 20 Figure 5 2 Analyzer Components ...
Страница 213: ...MODEL 1000 SEP 2005 MAINTENANCE 5 45 Figure 5 7 Analog Loopback with More Than Two Analog Outputs ...
Страница 218: ...SEP 2005 MODEL 1000 MAINTENANCE 5 50 Figure 5 10 Analyzer and GC Controller Interconnect Leads ...
Страница 222: ...SEP 2005 MODEL 1000 MAINTENANCE 5 54 This page intentionally left blank ...
Страница 228: ...SEP 2005 MODEL 1000 LIST OF APPENDICES A ii This page intentionally left blank ...
Страница 254: ...SEP 2005 MODEL 1000 GUIDE TO TRANSIENT PROTECTION MODULES C 8 This page intentionally left blank ...
Страница 260: ...SEP 2005 MODEL 1000 SETTING SOLENOID PURGE FLOWS E 4 This page intentionally left blank ...
Страница 280: ...SEP 2005 MODEL 1000 2350 to 2350A CPU RETROFIT INSTRUCTIONS F 20 This page intentionally left blank ...
Страница 282: ...SEP 2005 MODEL 1000 ANALYZER DRAWINGS Addendum 1 2 This page intentionally left blank ...
Страница 283: ......
Страница 284: ......
Страница 285: ......
Страница 286: ......
Страница 287: ......
Страница 288: ......
Страница 289: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......
Страница 293: ......
Страница 294: ......
Страница 295: ......
Страница 296: ......
Страница 298: ...SEP 2005 MODEL 1000 GC CONTROLLER DRAWINGS Addendum 2 2 Block Diagram of GC Controller Circuit Boards ...
Страница 299: ......
Страница 300: ......
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ......
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ......
Страница 309: ......
Страница 310: ......
Страница 311: ......
Страница 312: ......
Страница 313: ......
Страница 314: ......
Страница 316: ......
Страница 318: ......
Страница 319: ......