background image

technical bulletin

Document Part # 026-4600 Rev 3 23-APR-2008

Page 1 of 8

©2007 Emerson Climate Technologies Retail Solutions, Inc. This document may be photocopied for personal use. 

Visit our website at http://www.emersonretailsolutions.com/ for the latest technical documentation and updates.

C O M P U T E R  P R O C E S S  C O N T R O L S

®

Control Link RSC Installation Instructions

Overview

The Control Link Refrigeration System Controller (CL-RSC) is an electronic device that can control all functions 
of a single-compressor refrigeration system, including refrigeration, defrost, and alarming. Scheduled defrost and 
case light control is also possible with the addition of an expansion real-time clock module (P/N 618-2082, avail-
able separately).

The CL-RSC reads discharge air and defrost termination temperature from sensors mounted in the case. The CL-
RSC may control two external relays (compressor plus one configurable relay) directly from its two onboard dry-
contact relay outputs, or it may use a pluggable expansion output board (P/N 618-1120 for compressor control, or 
618-2085 for refrigeration solenoid control) for activating case system components.

NOTE: For information about networking Control Link RSC with E2, refer to Technical Bulletin 026-4602 
available on the Internet at http://www.emersonretailsolutions.com/library.

Mounting

Main Module / Relay Expansion Board

The Control Link main module and relay expansion boards are designed for mounting on a refrigerated case or in 
an enclosure near the case. The output board connects to the main module with a ribbon cable and therefore should 
be mounted directly below the main module using the attached stand-off bracket. 

Figure 1

 shows module dimen-

sions, and 

Figure 2

 shows relay expansion board dimensions.

             

Figure 1 - Control Link Module Mounting

Figure 2 - Expansion Board Mounting

Содержание Control Link Refrigeration System Controller

Страница 1: ...sors mounted in the case The CL RSC may control two external relays compressor plus one configurable relay directly from its two onboard dry contact relay outputs or it may use a pluggable expansion output board P N 618 1120 for compressor control or 618 2085 for refrigeration solenoid control for activating case system components NOTE For information about networking Control Link RSC with E2 refe...

Страница 2: ...lower right side of the Control Link module Figure 4 The expansion board is powered from the CL RSC and requires no external power connection Power Control Link Module with 618 1120 output board When the 618 1120 output board is used with a Control Link module connect the L and N spade lug terminals on the module to the L and N spade lug terminals on the output board Figure 4 Connect 120 240 VAC 5...

Страница 3: ...gure 7 Refer to Table 1 for relay ratings Compressor Relays The Control Link uses two relays on the output board to control the compressor Line voltage must be connected to the Line 1 and Line 2 connectors on relays 1 and 2 respectively The Load 1 and Load 2 connectors are wired to the compressor Figure 7 shows the wiring diagram Refer to Table 1 for relay ratings Pressure Switch Wiring If desired...

Страница 4: ...p based on the value of the CSUd parameter default 10 minutes After this delay the CL RSC resumes normal refrigeration control To prevent nuisance alarms when the case is first started up no high temperature case alarms will be generated until 120 minutes after the start of the first cooling cycle Normal Operation Refrigeration When in refrigeration mode the CL RSC energizes the compressor relay w...

Страница 5: ...h will also initiate a manual defrost Compressor Fail Safe Mode If the case temperature sensor fails the CL RSC will operate in a fail safe mode that cycles the compressor ON and OFF at a user defined regular interval The ON OFF rate is determined by setting parameters CSFP and CSFO in the CL RSC CSFP sets the interval period and CSFO sets the amount of time during that period the compressor will ...

Страница 6: ...ds or leave controller idle for 60 seconds You will lose all setpoint changes made since you entered general programming mode NOTE Parameters in General Parameters shaded gray are only shown if the real time clock module is being used General Parameters Code Description Min Max Default CSP Temp control set point deg F can be displayed in deg C 40 100 25 CLSt Clock time set military UP button adjus...

Страница 7: ...liary input whose function is determined by SI2d ntc dGt ntc SI2d If input 2 defr term is dGt determines function of digital input SS setpoint shift ON causes the value of CSS to be added to set points IdeF start manual defrost IdeF SS IdeF SI3 Determines type of sensor on input 3 ntc 10K CPC thermistor dGT digital sensor ntc dGt ntc SI3d If input 3 is dGt determines function of digital input SS s...

Страница 8: ... the auxiliary relay ALAr close on alarm LCOn lighting control Visible only if rYbd yES ALAr LCOn ALAr LIOn LIOF L6On L6Of Visible only if ArA LCon or r2Fn LCon There are six ON OFF pairs where you may specify times of day for turning the lighting control relay ON and OFF Enter the first ON time of the day in the L1On field and the first OFF time in the L1OF field If necessary continue entering ON...

Отзывы: