S1400T-2808B
Page 2-2
Section 2 - Protection
2.2.1
Considerations For The Protection of Personnel
Always evaluate the site environment as if your life depended on it. Make sure that you
understand the physical nature of the location where you will be working. Table 2-1
provides a general guideline for evaluating an installation site.
Table 2-1 - Installation Site Safety Evaluation Guide
#
Guide
1 Indoor or outdoor – Dress Appropriately
2 If outdoor, what kind of environment, terrain, etc. Watch out for local varmint (bees,
spiders, snakes, etc.)
3 If indoor or outdoor – determine if there are any pieces of dangerous equipment or any
processes which might be a risk to your safety
4 If in a tunnel, bunker, etc. watch out for a build up of toxic or flammable gases. Make
sure the air is good. Watch out for local varmint (bees, spiders, snakes, etc.)
5 Hazardous or Non-Hazardous Environment – Wear appropriate safety equipment and
perform all necessary safety measures.
6 Before installing any equipment or power or ground wiring, make sure that there are no
lethal (life threatening) voltages between the site where the instrument will be installed
and other equipment, pipes, cabinets, etc. or to earth itself.
7 Never assume that adjacent or peripheral equipment has been properly installed and
grounded. Determine if this equipment and a TeleFlow can be touched simultaneously
without hazard to personnel and/or equipment?
8 Before embarking to remote locations where there are few or no human inhabitants ask a
few simple questions like, should I bring water, food, hygienic materials, first aid kit, etc?
Be Prepared!
9 Observe the work habits of those around you – for your own safety!
Some of the items that a service person should consider before ever going on site can be
ascertained by simply asking questions of the appropriate individual. Obviously other
safety considerations can only be established at the installation site.
2.2.2
Considerations For The Protection of Equipment
Always evaluate the site installation/service environment and equipment. Understand the
various physical interfaces you will be dealing with such as Series 2808 Transmitter
mounting and supporting, transducer mechanical and electrical connections, analog and
digital circuits, power circuits, communication circuits and various electrical grounds. Table
2-2 provides a general guideline for evaluating the equipment protection requirements of an
installation site.
Table 2-2 - Equipment Protection Site Safety Evaluation Guide
#
Guide
Reference Section
1
Environment - Class I, Division 2 - Nonincendive
Environment - Class I, Division 1 - Intrinsically Safe
Other – Safe or unrated area
See Appendix A of CI-3808
See CI-3530-IStran
2
Earth Ground - Established by mechanical/electrical or (both)
or not at all.
See Section 3
3
Is the area prone to lightning strikes?
See Section 4
4
Are there surge suppressors installed or to be installed?
See Section 4
Содержание Bristol 2808 Series
Страница 12: ...BLANK PAGE ...
Страница 14: ...1 2 Introduction 2808B Figure 1 1 2808 XXB Transmitters ...
Страница 16: ...BLANK PAGE ...
Страница 23: ...2808B GP Transmitters 1A 7 Figure 1A 5 Overall Dimensions Model 2808 15B With Neck Type Mounting Bracket ...
Страница 24: ...1A 8 GP Transmitters 2808B Figure 1A 6 Overall Dimensions Model 2808 16B With Neck Type Mounting Bracket ...
Страница 30: ...BLANK PAGE ...
Страница 32: ...1B 2 DP Transmitters 2808B Figure 1B 1 Model 2808 35B Figure 1B 2 Transmitter Assemblies ...
Страница 37: ...2808B DP Transmitters 1B 7 Figure 1B 4C Dimensions for Model 2808 35B Transmitter With Manifold Adapter Option ...
Страница 40: ...1B 10 DP Transmitters 2808B Figure 1B 6 Transmitter Housing Rotation Diagram ...
Страница 54: ...BLANK PAGE ...
Страница 57: ...2808B Calibration 3 3 Figure 3 2 Calibration Adjustments ...
Страница 60: ...3 6 Calibration 2808B TABLE 3 A COARSE ZERO SWITCH SETTINGS Elevation ...
Страница 61: ...2808B Calibration 3 7 TABLE 3 B COARSE ZERO SWITCH SETTINGS Suppression ...
Страница 66: ...BLANK PAGE ...
Страница 68: ...4 2 Service 2808B Figure 4 1 Using Internal TEST Terminals to Measure Current ...
Страница 72: ...BLANK PAGE ...
Страница 74: ...BLANK PAGE ...
Страница 81: ...Appendix B Page 5 Loop Powered Indicator Figure 2 2 Loop Powered Indicator Installation Diagram ...
Страница 90: ...BLANK PAGE ...
Страница 92: ...BLANK PAGE ...
Страница 100: ...BLANK PAGE ...
Страница 127: ...ESDS Manual S14006 4 15 92 CARE AND HANDLING OF PC BOARDS AND ESD SENSITIVE COMPONENTS BRISTOL BABCOCK ...
Страница 128: ...BLANK PAGE ...
Страница 139: ...BLANK PAGE ...