Maintenance
46
20. Carefully slide the hose (
1
) onto the reagent tube (
5
).
The hose must be pushed at least 5 mm over the
reagent tube connector.
21. Secure the hose (
1
) using the clamp (
2
).
The reagent tube on the catalyst furnace has been filled.