4
1
Notes on the Service Manual ................................................................................................................ 6
1.1
Explanations of the safety warnings .................................................................................................. 6
2
Installation ............................................................................................................................................... 8
2.1
Setting check up ................................................................................................................................ 8
2.2
Front panel illustration ....................................................................................................................... 9
2.3
Mains power connections ................................................................................................................ 10
2.4
Data Interface .................................................................................................................................. 11
2.5
Oxygen connection .......................................................................................................................... 12
2.6
Operation modes ............................................................................................................................. 12
2.7
Adjusting the gas flow ...................................................................................................................... 14
2.8
Temperature adjustment .................................................................................................................. 15
2.9
Preheating the furnace .................................................................................................................... 15
2.9.1
Configuration of preheating ......................................................................................................... 15
2.9.2
BIOS-configuration ...................................................................................................................... 16
3
Analysis ................................................................................................................................................. 17
3.1
Working procedure .......................................................................................................................... 17
3.1.1
Procedure of carrying out analyses with autoloader.................................................................... 17
3.1.2
Procedure of carrying out analyses with manual loading of the sample ..................................... 18
3.2
TIC-determination ............................................................................................................................ 19
3.2.1
TIC-module .................................................................................................................................. 19
3.2.2
TIC analysis ................................................................................................................................. 19
3.2.3
TIC-module installation ................................................................................................................ 20
3.2.4
TIC-module Operation procedure ................................................................................................ 21
3.3
Applications...................................................................................................................................... 22
3.3.1
Coal .............................................................................................................................................. 22
3.3.2
Calcium Carbonate ...................................................................................................................... 22
3.3.3
Graphite ....................................................................................................................................... 22
3.3.4
Limestone .................................................................................................................................... 22
3.3.5
Oil, Asphalt and Rubber ............................................................................................................... 22
3.3.6
Wood ............................................................................................................................................ 22
4
Maintenance .......................................................................................................................................... 24
4.1
General information ......................................................................................................................... 24
4.2
Reagent tubes filling ........................................................................................................................ 26
4.2.1
Reagent tube replacing ................................................................................................................ 26
4.2.2
Filling quantities ........................................................................................................................... 27
4.3
Moisture trap replacing (furnace) ..................................................................................................... 29
4.4
O-rings replacing ............................................................................................................................. 29
4.5
Dust filter cartridge replacing ........................................................................................................... 30
4.6
Combustion tube replacing .............................................................................................................. 31
4.7
Lance replacing ............................................................................................................................... 32
4.8
Heating elements replacing ............................................................................................................. 33
5
Function description ............................................................................................................................ 35
5.1
Measuring principle .......................................................................................................................... 35
5.2
Gas flow system .............................................................................................................................. 36
5.3
Infrared cell ...................................................................................................................................... 39
5.4
Micro-controller unit and PC Software ............................................................................................. 40
Содержание CS-580A
Страница 2: ...2 Copyright Copyright by Eltra GmbH Haan Retsch Allee 1 5 D 42781 Haan Federal Republic of Germany ...
Страница 3: ...3 ...
Страница 23: ...Analysis 23 Weight 350mg Set the minimum analysis time to 50s Set the comparator level to 20mV ...
Страница 38: ...Function description 38 Fig 14 Gas flow ...
Страница 48: ...Ordering numbers 48 6 6 TIC module Fig 17 TIC module 35543 9008 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ...
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ...Copyright Copyright by Eltra GmbH Haan Retsch Allee 1 5 D 42781 Haan Federal Republic of Germany ...