Installation
11
All power cables of peripheral devices [computer (
2
), the printer (
4
) and the
balance (
5
)] should be connected to the quad mains power socket (
6
) as shown in
the figure.
Remark
Before placing balance, PC, display and printer on the desk for connecting their
power cables, the loader should be attached to the analyzer and aligned. Please,
refer to “LOADER installation, service and operation manual” for the instructions on
installation, connection and alignment of the loader.
2.4 Data Interface
Fig. 3: Microcontroller board
1
PC USB connector
2
Power and temperature control interface
3
Analog input/output signals
4
Pump control
5
24V connector
6
Digital input/output signals
7
Autoloader connection
8
Regulating valve (not relevant for CS-580A)
When all units are connected to the mains power, then interface connections can
be made. The required interface cables are included in the scope of supply. The
supplied additional devices have been already adapted to the interfaces when the
analyzers are taken into operation in our company. The plugs are all different from
each other, so that they cannot be interchanged. The computer is already provided
with operation system and with software for controlling the analyzer.
Содержание CS-580A
Страница 2: ...2 Copyright Copyright by Eltra GmbH Haan Retsch Allee 1 5 D 42781 Haan Federal Republic of Germany ...
Страница 3: ...3 ...
Страница 23: ...Analysis 23 Weight 350mg Set the minimum analysis time to 50s Set the comparator level to 20mV ...
Страница 38: ...Function description 38 Fig 14 Gas flow ...
Страница 48: ...Ordering numbers 48 6 6 TIC module Fig 17 TIC module 35543 9008 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ...
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ...Copyright Copyright by Eltra GmbH Haan Retsch Allee 1 5 D 42781 Haan Federal Republic of Germany ...