Installation
10
2.3 Mains power connections
Since the infrared cell requires about 1 hour for reaching a stable operating
temperature, it is advisable to first connect the analyzer to the mains power and to
set the mains power switch to position 1 before further installation work is carried
out.
This waiting time is only necessary when the analyzer was completely switched off
(position 0). It is recommended to keep the analyzer at standby (position 1) during
working breaks, to keep the IR-cell operating temperature stable.
The furnace temperature is software controlled.
Fig. 2:Rearview – Mains power connections
1
Analyzer
2
Computer
3
Monitor
4
Printer
5
Balance
6
Quad power socket
At first, only the analyzer (
1
) is plugged in and switched on. Turn the mains power
switch to position 1 (stand-by condition). The switch is on the front panel of the
analyzer. See chapter
The mains power cable of the analyzer is mounted inside the analyzer.
35434
1
2
2
3
4
5
1
6
Pass the cables
through the
provided hole
between the two fans
of the bottom panel.
Содержание CS-580A
Страница 2: ...2 Copyright Copyright by Eltra GmbH Haan Retsch Allee 1 5 D 42781 Haan Federal Republic of Germany ...
Страница 3: ...3 ...
Страница 23: ...Analysis 23 Weight 350mg Set the minimum analysis time to 50s Set the comparator level to 20mV ...
Страница 38: ...Function description 38 Fig 14 Gas flow ...
Страница 48: ...Ordering numbers 48 6 6 TIC module Fig 17 TIC module 35543 9008 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ...
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ...Copyright Copyright by Eltra GmbH Haan Retsch Allee 1 5 D 42781 Haan Federal Republic of Germany ...