Elnur CM15BG Скачать руководство пользователя страница 8

Filling loop

Always use assistance if required. Wear suitable cut resistant gloves when handling the appliance. 

Ensure safe lifting techniques are used.  Do not lift the appliance by attached pipe-work or components. 

When lifting the boiler ensure that the fixing elements and the wall have a sufficient load-bearing capacity. Check the 
quality of the wall. 

4.7 WATER CONNECTIONS 

CAUTIONThe hydraulic connections must be carried out respecting the flow and return marked on the boiler. 

 

CAUTION  When tightening or loosening threaded connections, always use suitable tools as open-end 

spanners. Do not use pipe wrenches, extensions or unsuitable tools that may cause damage or water leaks. 
 

 Install purges in the radiators and high points of the installation. 

 

Filling Loop 

A combi filling loop is required for filling of the heating system and replacing water lost during servicing or bleeding 
and should be installed close to the boiler. The loop should be as shown in the diagram and comply with current 
Water Supply Regulations. The temporary connection should be removed after filling and the valves sealed with 
suitable caps. 

 

 

 

 

 

Heating Flow & Return 

These connections are ¾ “ for connection to 22mm pipe using the tails provided. Service valves should be installed 
at this position to allow the boiler to be isolated for maintenance without the need to drain the entire system. The 
valves should be of sufficiently large bore so not to restrict the heating circulation.  

The boiler is not suitable for single pipe heating systems, only a twin-pipe heating system should be used.  

Drain Point 

A drain point should be fitted at the lowest point of the system. It is not acceptable to drain the boiler through the 
safety valve as debris and deposits will prevent correct operation of the valve. 

Heating System By-pass 

The heating water flow switch requires a minimum flow rate through the boiler of 7 L per minute for correct 
operation. Systems fitted throughout with Thermostatic Radiator Valves will require provision of a System By-pass 

to maintain sufficient flow should all the valves be closed. (see 7.3 HEATING SYSTEM FLOW SWITCH – E3 ERROR 

& SYSTEM BY-PASS REQUIREMENTS).  

 

System Expansion 

An integral 6 L expansion vessel provides for expansion of the heated system water under normal conditions 
however a system with larger volumes of water may require extra expansion capacity to be provided. 

 

 

i

Mains water 
supply 

Heating 
system 

valve

valve

Содержание CM15BG

Страница 1: ...must be followed for the safe installation of the boiler Any problem fault or damage caused by the non observance ofthese instructions will not be covered under the manufacturer s warranty This manual...

Страница 2: ...rved and given to any new user The symbols used in the text are explained below WARNING This indication shows the possibility of causing death from electric shock WARNING This indication shows the pos...

Страница 3: ...he hot water supply to ensure a safe and economic supply of hot water All components for sealed system central heating are built in A suitable filling loop should be fitted externally to comply with w...

Страница 4: ...nts before commencing SITING THE BOILER WARNINGWall and fixings must be suitable to support the total weight CMX boiler when full is 120 kg CM boiler when full is 50 kg Allow sufficient clearance and...

Страница 5: ...current building regulations Installation should also be in accordance with the relevant British Standards and Codes of Practice including the following BS 5449 Forced circulation hot water systems BS...

Страница 6: ...r splashing onto the boiler or controls Electrical safety regulations for clearances must be followed if installed in a bathroom or shower area The boiler has an electric protection rating of IP20 IP2...

Страница 7: ...to enable easy access for servicing Ensure sufficient space to make all water connections including the outlet pipes for the heating and hot water safety valves which should be routed to a suitable d...

Страница 8: ...able caps Heating Flow Return These connections are for connection to 22mm pipe using the tails provided Service valves should be installed at this position to allow the boiler to be isolated for main...

Страница 9: ...d with a continuous fall to a safe yet visible point where any discharge cannot cause damage or injury 4 8 DHW DISCHARGE PIPE WORK The CMX electric combi boiler range incorporates a 50 L unvented hot...

Страница 10: ...ection to Mains Supply The CM15BG and CMX15BG boilers must be installed in premises having a system impedance of not more than 0 25 j0 25 The CM15BG and CMX15BG boilers comply with the technical requi...

Страница 11: ...the connection block as shown The terminal connection block is at the rear right hand side of the boiler and is accessed after removing the boiler front panel The supply cable should be safely routed...

Страница 12: ...ing from t oned upside d the switches t hree phase su elected output ED HEAT OU ial to confirm f electronic card 1 mum heat outp NS WHERE TH L MUST BE RE also be limited best hot wate mum but will s p...

Страница 13: ...remains in the system or there is insufficient pressure or flow rate the boiler will fail to operate and display fault E3 A LED indicator informs about the operating status of the pump Green correct...

Страница 14: ...SWITC GE COULD O gene on th Turn of th Main switc i temperatu nd other essages Red dot shows heating heating lements on duty 3 ghly prior to BS7593 BS54 boiler Any cle efully followed RESSURE REL T O...

Страница 15: ...ay o DHW produ W and the elem desired tempe rature can be t the setting t s or instantly between 20 a ver the centra m temperatur D n 1 The same but he butto y will show th uction over ce ments are en...

Страница 16: ...n fo er will be lock will function n e same button there is a fail ON l automatically activity The p 1 as room therm button Pushin ay will show th e of the water o adjust the v w seconds or C and 85 C...

Страница 17: ...3 Fault E3 continued System resistance too high or blockage Check pump speed 3 Check pump duty sect 4 9 Open all radiator valves Install system by pass Fault E5 displayed Error in configuration for ma...

Страница 18: ...ect the bo dition are he heating sys Check as sho m debris or a y restrictions s ostatic In th the boiler dur ever the guida g of an automa inimum flow r asteful circula OUTPUT actual heat po that mom...

Страница 19: ...most rigorous environmental requirements For example the selection of materials involves guaranteeing their biodegradability re use and recycling When this boiler s long useful life is over it must b...

Страница 20: ...3kW A 13 0 13 0 DHW available time with 15kW min 5 49 DHW available time with 13kW min 6 42 DHW available time with 12kW min 7 16 DHW available time with 11kW min 7 56 DHW available time with 10kW min...

Страница 21: ...arries the structions and 5 2 CLARACI De acuerdo DECLARAT According to LNUR S A LNUR S A I El Nogal V 8110 Algete Caldera modu Caldera modu CMBG Heat CMXBG Hea GABARR N CM15BG CM pecificacion ular al...

Страница 22: ...21 NOTES...

Страница 23: ...22 13 WIRING DIAGRAMS...

Страница 24: ...ufact ELNU Traves a de V 28110 Alge Telephone 3 ement the man dicates that this e collection po osed of corre ealth which co cycling of this p hased the prod plier UK Ltd 0 1942 67011 nur co uk nur co...

Отзывы: