Elnur CM15BG Скачать руководство пользователя страница 11

10 

MINIMUM CONTACT GAPS OF 3mmIN EVERY POLE AND PROTECTED BY A SUITABLY RATED CIRCUIT 
BREAKER MCB/RCD 
Install the necessary electrical protections as indicated in the current regulations. In the event of these regulations 
not being complied with, the manufacturer will not be liable for any bodily injury or material damage that may occur. 

 WARNING 

IT IS ESSENTIAL THAT THE BOILER IS PROPERLY EARTHEDand the wiring tested to 

current IEE regulations. 

Electrical Supply Sizing  

The following table shows the specification for a boiler installed on single phase supply. 

 
Connection to Boiler 

 WARNING 

Touching live connections can cause serious personal injury.  

Before establishing a mains connection switch off the power supply. Secure the power supply against being switched 
on again.Mains connection terminals remain live even if the on/off switch is turned off. 
 
The boiler is delivered ready for operation on 3x400V three phase supply. For operation on 230V single phase the 
bridging connections supplied must be connected across the terminals of the connection block as shown.  

 

 

 

 

 

 

The terminal connection block is at the rear right-hand side of the boiler and is accessed after removing the boiler 
front panel . The supply cable should be safely routed to this point through the cable entry point on the right hand 
bottom of the boiler. 

 CAUTION: A mains voltage at the incorrect plug terminal can destroy the electronics. 

 Make sure the connectin cables are securely fastened to the plug terminals. 

Wiring External Controls 

It is recommended that the boiler is controlled by an external control such as a time clock or room thermostat or a 
combined programmable room thermostat such as the Elnur model CTP-10.  

 CAUTION: The switching connection of this control should be VOLT FREE and connected to the terminals 

indicated 

‘TA’

 on the PCB. The factory fitted link across these terminals must be removed.  

The boiler’s automatic power modulation feature is activated by the initial interruption of this switching link. 

 

 

i

Rated output of boiler 

4kW 5kW 6kW 7kW 8kW 9kW 10kW 11kW 12kW 13kW 15kW 

Supply current 

17.4A 21.7A 26.1A 30.4A 34.8A 39.1A 43.5A 47.8A 52.2A 56.5A 65.2A 

MCB / RCD rating 

20A 25A 32A 32A 40A 50A 50A 50A 63A 63A 80A 

Minimum cable size 

2.5mm  4mm  4mm  6mm  6mm  10mm 10mm 10mm 16mm 16mm 16mm

 

Содержание CM15BG

Страница 1: ...must be followed for the safe installation of the boiler Any problem fault or damage caused by the non observance ofthese instructions will not be covered under the manufacturer s warranty This manual...

Страница 2: ...rved and given to any new user The symbols used in the text are explained below WARNING This indication shows the possibility of causing death from electric shock WARNING This indication shows the pos...

Страница 3: ...he hot water supply to ensure a safe and economic supply of hot water All components for sealed system central heating are built in A suitable filling loop should be fitted externally to comply with w...

Страница 4: ...nts before commencing SITING THE BOILER WARNINGWall and fixings must be suitable to support the total weight CMX boiler when full is 120 kg CM boiler when full is 50 kg Allow sufficient clearance and...

Страница 5: ...current building regulations Installation should also be in accordance with the relevant British Standards and Codes of Practice including the following BS 5449 Forced circulation hot water systems BS...

Страница 6: ...r splashing onto the boiler or controls Electrical safety regulations for clearances must be followed if installed in a bathroom or shower area The boiler has an electric protection rating of IP20 IP2...

Страница 7: ...to enable easy access for servicing Ensure sufficient space to make all water connections including the outlet pipes for the heating and hot water safety valves which should be routed to a suitable d...

Страница 8: ...able caps Heating Flow Return These connections are for connection to 22mm pipe using the tails provided Service valves should be installed at this position to allow the boiler to be isolated for main...

Страница 9: ...d with a continuous fall to a safe yet visible point where any discharge cannot cause damage or injury 4 8 DHW DISCHARGE PIPE WORK The CMX electric combi boiler range incorporates a 50 L unvented hot...

Страница 10: ...ection to Mains Supply The CM15BG and CMX15BG boilers must be installed in premises having a system impedance of not more than 0 25 j0 25 The CM15BG and CMX15BG boilers comply with the technical requi...

Страница 11: ...the connection block as shown The terminal connection block is at the rear right hand side of the boiler and is accessed after removing the boiler front panel The supply cable should be safely routed...

Страница 12: ...ing from t oned upside d the switches t hree phase su elected output ED HEAT OU ial to confirm f electronic card 1 mum heat outp NS WHERE TH L MUST BE RE also be limited best hot wate mum but will s p...

Страница 13: ...remains in the system or there is insufficient pressure or flow rate the boiler will fail to operate and display fault E3 A LED indicator informs about the operating status of the pump Green correct...

Страница 14: ...SWITC GE COULD O gene on th Turn of th Main switc i temperatu nd other essages Red dot shows heating heating lements on duty 3 ghly prior to BS7593 BS54 boiler Any cle efully followed RESSURE REL T O...

Страница 15: ...ay o DHW produ W and the elem desired tempe rature can be t the setting t s or instantly between 20 a ver the centra m temperatur D n 1 The same but he butto y will show th uction over ce ments are en...

Страница 16: ...n fo er will be lock will function n e same button there is a fail ON l automatically activity The p 1 as room therm button Pushin ay will show th e of the water o adjust the v w seconds or C and 85 C...

Страница 17: ...3 Fault E3 continued System resistance too high or blockage Check pump speed 3 Check pump duty sect 4 9 Open all radiator valves Install system by pass Fault E5 displayed Error in configuration for ma...

Страница 18: ...ect the bo dition are he heating sys Check as sho m debris or a y restrictions s ostatic In th the boiler dur ever the guida g of an automa inimum flow r asteful circula OUTPUT actual heat po that mom...

Страница 19: ...most rigorous environmental requirements For example the selection of materials involves guaranteeing their biodegradability re use and recycling When this boiler s long useful life is over it must b...

Страница 20: ...3kW A 13 0 13 0 DHW available time with 15kW min 5 49 DHW available time with 13kW min 6 42 DHW available time with 12kW min 7 16 DHW available time with 11kW min 7 56 DHW available time with 10kW min...

Страница 21: ...arries the structions and 5 2 CLARACI De acuerdo DECLARAT According to LNUR S A LNUR S A I El Nogal V 8110 Algete Caldera modu Caldera modu CMBG Heat CMXBG Hea GABARR N CM15BG CM pecificacion ular al...

Страница 22: ...21 NOTES...

Страница 23: ...22 13 WIRING DIAGRAMS...

Страница 24: ...ufact ELNU Traves a de V 28110 Alge Telephone 3 ement the man dicates that this e collection po osed of corre ealth which co cycling of this p hased the prod plier UK Ltd 0 1942 67011 nur co uk nur co...

Отзывы: