Elnur CM15BG Скачать руководство пользователя страница 14

 
5.4 H

The h
conta
curre

NOT
SYSTE
SHOU

5.5 FI

Open
allowi

6 OP

 

6.1 IN

 

 

6.2 C

MOD

 
 

 
 
 
 
 
 
 

Power O

DHW

De

te

EATING SYST

 CAUTION

heating system

aminants detri

nt standards a

E: IT IS IMPO

EM AS TRAPP

ULD BE USED

LLING DOM

n the mains wa

ing water to f

PERATING T

NITIAL SWITC

 CAUTION

 

ONTROL PA

DELS CMX15B

ON/OFF 

W.key

 

ecreasesDH

W. 

emperature 

TEM FLUSHIN

N:   Flush the 

m should be flu

mental to the

and the manuf

ORTANT NOT

PED DEBRIS W

D. 

ESTIC HOT W

ater inlet valve

flow until no a

THE BOILE

CHING ON  

N: THE MAXI

BOILER SH

TANK EMP

ANEL DESCRI

BG 

Increases 

DHW. 

temperature

Red dot show

DHW. heatin

elements on du

NG  

heating instal

ushed in accor

e operation an

facturer’s inst

T TO USE TH

WILL CAUSE

WATER  

e underneath 

air is present. 

ER 

IMUM HEAT 

HOULD NEVE

PTY. DAMAG

IPTION 

DHW.

re an

me

R
h

el

ws 

ng 

uty 

1

lation thoroug

rdance with B

nd life of the b

tructions care

HE BOILER PR

E INCORREC

the boiler. Tu

This will auto

OUTPUT MU

ER BE SWITC

GE COULD O

gene

on th
 

Turn
of th

Main
switc

i

.temperatu
nd other 

essages 

Red dot shows 
heating heating 
lements on duty

ghly prior to 

BS7593 & BS54

boiler. Any cle

efully followed

RESSURE REL

T OPERATIO

urn on all the 

omatically ven

UST BE ADJU

CHED ON W

OCCUR. 

When the b

eral self-check

he display. 

n on the boile

he boiler as sh

ns connection 

ch is turned o

Heating  wa

temp. and ot

messages

Decrea

ngwate

at

installation. 

449 which wi

eanser or addi

d. 

LIEF VALVE TO

ON. A PURPO

hot water sy

t the integral 

USTED BEFOR

ITH THE HEA

oiler is first c

k and if a fault 

r with the on

hown. 

terminals rem

off. 

Inc

ngw

ater 

ther 

asesheati

rtemper

ure 

ll remove any
itives used sh

O DRAIN OR

OSE PROVIDE

ystem taps and

hot water sto

RE SWITCHIN

ATING SYSTE

onnected it w

is detected it

/off switch loc

main live even

creasesheati

watertempe

rature 

K
bl

Power ON

heatingk

y debris or 

ould comply w

R FLUSH THE

ED DRAIN PO

d thoroughly f

ore of any air.

NG ON.THE 

EM OR DHW

will perform a 

t will be indica

cated at the b

n if the on/off 

 

Keyboardlo

dicator

Keyboard power O

lock ON/OFF 

/OFF 

key

 

with 

OINT 

flush 

ated 

back 

ckin

ON/ OFF  

Содержание CM15BG

Страница 1: ...must be followed for the safe installation of the boiler Any problem fault or damage caused by the non observance ofthese instructions will not be covered under the manufacturer s warranty This manual...

Страница 2: ...rved and given to any new user The symbols used in the text are explained below WARNING This indication shows the possibility of causing death from electric shock WARNING This indication shows the pos...

Страница 3: ...he hot water supply to ensure a safe and economic supply of hot water All components for sealed system central heating are built in A suitable filling loop should be fitted externally to comply with w...

Страница 4: ...nts before commencing SITING THE BOILER WARNINGWall and fixings must be suitable to support the total weight CMX boiler when full is 120 kg CM boiler when full is 50 kg Allow sufficient clearance and...

Страница 5: ...current building regulations Installation should also be in accordance with the relevant British Standards and Codes of Practice including the following BS 5449 Forced circulation hot water systems BS...

Страница 6: ...r splashing onto the boiler or controls Electrical safety regulations for clearances must be followed if installed in a bathroom or shower area The boiler has an electric protection rating of IP20 IP2...

Страница 7: ...to enable easy access for servicing Ensure sufficient space to make all water connections including the outlet pipes for the heating and hot water safety valves which should be routed to a suitable d...

Страница 8: ...able caps Heating Flow Return These connections are for connection to 22mm pipe using the tails provided Service valves should be installed at this position to allow the boiler to be isolated for main...

Страница 9: ...d with a continuous fall to a safe yet visible point where any discharge cannot cause damage or injury 4 8 DHW DISCHARGE PIPE WORK The CMX electric combi boiler range incorporates a 50 L unvented hot...

Страница 10: ...ection to Mains Supply The CM15BG and CMX15BG boilers must be installed in premises having a system impedance of not more than 0 25 j0 25 The CM15BG and CMX15BG boilers comply with the technical requi...

Страница 11: ...the connection block as shown The terminal connection block is at the rear right hand side of the boiler and is accessed after removing the boiler front panel The supply cable should be safely routed...

Страница 12: ...ing from t oned upside d the switches t hree phase su elected output ED HEAT OU ial to confirm f electronic card 1 mum heat outp NS WHERE TH L MUST BE RE also be limited best hot wate mum but will s p...

Страница 13: ...remains in the system or there is insufficient pressure or flow rate the boiler will fail to operate and display fault E3 A LED indicator informs about the operating status of the pump Green correct...

Страница 14: ...SWITC GE COULD O gene on th Turn of th Main switc i temperatu nd other essages Red dot shows heating heating lements on duty 3 ghly prior to BS7593 BS54 boiler Any cle efully followed RESSURE REL T O...

Страница 15: ...ay o DHW produ W and the elem desired tempe rature can be t the setting t s or instantly between 20 a ver the centra m temperatur D n 1 The same but he butto y will show th uction over ce ments are en...

Страница 16: ...n fo er will be lock will function n e same button there is a fail ON l automatically activity The p 1 as room therm button Pushin ay will show th e of the water o adjust the v w seconds or C and 85 C...

Страница 17: ...3 Fault E3 continued System resistance too high or blockage Check pump speed 3 Check pump duty sect 4 9 Open all radiator valves Install system by pass Fault E5 displayed Error in configuration for ma...

Страница 18: ...ect the bo dition are he heating sys Check as sho m debris or a y restrictions s ostatic In th the boiler dur ever the guida g of an automa inimum flow r asteful circula OUTPUT actual heat po that mom...

Страница 19: ...most rigorous environmental requirements For example the selection of materials involves guaranteeing their biodegradability re use and recycling When this boiler s long useful life is over it must b...

Страница 20: ...3kW A 13 0 13 0 DHW available time with 15kW min 5 49 DHW available time with 13kW min 6 42 DHW available time with 12kW min 7 16 DHW available time with 11kW min 7 56 DHW available time with 10kW min...

Страница 21: ...arries the structions and 5 2 CLARACI De acuerdo DECLARAT According to LNUR S A LNUR S A I El Nogal V 8110 Algete Caldera modu Caldera modu CMBG Heat CMXBG Hea GABARR N CM15BG CM pecificacion ular al...

Страница 22: ...21 NOTES...

Страница 23: ...22 13 WIRING DIAGRAMS...

Страница 24: ...ufact ELNU Traves a de V 28110 Alge Telephone 3 ement the man dicates that this e collection po osed of corre ealth which co cycling of this p hased the prod plier UK Ltd 0 1942 67011 nur co uk nur co...

Отзывы: